12
3.1. Rack Mounting
When installing the IGS-L5408MGSFP switch in a 19 inch rack, it must always be
mounted horizontally with the top side up. This procedure requires the following items:
■ Four bracket screws (included eight with the switch)
■ Two equipment rack brackets (included four with the switch)
■ Cross-head screwdriver (not provided)
■ Four standard equipment rack screws (not provided)
Perform this procedure to install the switch in a 19-inch equipment rack:
1. Secure the two rack mount brackets to the sides of the switch using the eight
bracket screws provided.
2. Have another person hold the switch in the equipment rack while you secure it
using standard rack mount screws (not provided).
Содержание IGS-L5408MGSFPR-AC
Страница 7: ...6 DC model Metal case IP 30 440mm W x255mm D x44mm H...
Страница 14: ...13...
Страница 22: ...21 Console login interface...