18
Hardware Installation
In this paragraph, we will describe how to install the 10/100/1000Base-T
Industrial Switch converter and the installation points for the attention.
Installation Steps
1. Unpacked the Industrial switch converter packing.
2. Check the DIN-Rail is screwed on the Industrial switch converter. If the
DIN-Rail is not screwed on the Industrial switch converter. Please refer to
DIN-Rail Mounting
section for DIN-Rail installation. If you want to wall
mount the Industrial switch converter, then please refer to
Wall Mount
Plate Mounting
section for wall mount plate installation.
3. To hang the Industrial switch converter on the DIN-Rail track or wall,
please refer to the
Mounting Installation
section.
4. Power on the Industrial switch converter. How to wire the power; please
refer to the
Wiring the Power Inputs
section. The power LED on the