background image

7

Receiving the Oven

Upon receipt, check for freight damage, both visible and concealed.  Visible
damage should be noted on the freight bill at the time of delivery and signed by the
carrier's agent.  Concealed loss or damage means loss or damage which does not
become apparent until the merchandise has been unpacked.  If concealed loss or
damage is discovered upon unpacking, make a written request for inspection by the
carrier's agent within 15 days of delivery.  All packing material should be kept for
inspection.  Do not return damaged merchandise to Lang Manufacturing Company.
File your claim with the carrier.

Location

Prior to un-crating, move the oven as near its intended location as practical.  The
crating will help protect the unit from the physical damage normally associated
with moving it through hallways and doorways.

Un-crating

The oven will arrive completely assembled inside a wood frame covered by
cardboard box and strapped to a skid.  

Remove the cardboard cover, cut the

straps and remove the wood frame.

CAUTION:

OVEN WEIGHS 430 LBS. (195 kilograms).  FOR SAFE
HANDLING, INSTALLER SHOULD OBTAIN HELP AS
NEEDED, OR EMPLOY APPROPRIATE MATERIALS
HANDLING EQUIPMENT (SUCH AS A FORKLIFT,
DOLLY, OR PALLET JACK) TO REMOVE THE UNIT
FROM THE SKID AND MOVE IT TO THE PLACE OF
INSTALLATION.

CAUTION:

ANY STAND, COUNTER OR OTHER DEVICE ON WHICH
OVEN WILL BE LOCATED MUST BE DESIGNED TO
SUPPORT THE WEIGHT OF THE OVEN (430 LBS.).

CAUTION:

SHIPPING STRAPS ARE UNDER TENSION AND CAN
SNAP BACK WHEN CUT.

Remove oven from skid and place in intended location.

INSTALLING THE LEGS

Legs are available for single or double stack installations.  Single deck installations
require a 27-inch leg and double deck installations require a 6-inch leg.
To install the 27-inch legs, place some cardboard on the floor and gently tip the
oven onto its back.  Fasten two legs to the oven's front.  Lift the oven onto its front
legs and block the back up using one of the 27-inch legs set upside down in the
center rear of the oven body.  Install the last 27-inch leg onto the oven body on the
control side rear.  Gently lift the oven rear, remove the leg set to support the oven
center and install it on the last rear corner.
To install the 6-inch legs, place some cardboard on the floor and gently tip the oven
onto its back.  Fasten the four 6-inch legs into the threaded holes provided on the
bottom of the convection oven. Gently lift the oven onto the legs.

UNPACKING

Содержание 2F11-CLS-L

Страница 1: ...ill Creek Parkway Everett WA 98203 Rev A Phone 425 349 2400 Fax 425 349 2733 WWW LANGWORLD COM Copyright 2001 Installation Operation Maintenance Troubleshooting Model 2F11 CLS L Full Size Double Stack...

Страница 2: ...LLS GAS THIS INFORMATION SHALL BE OBTAINED BY CONSULTING YOUR LOCAL GAS SUPPLIER AS A MINIMUM TURN OFF THE GAS AND CALL YOUR GAS COMPANY AND YOUR AUTHORIZED SERVICE AGENT EVACUATE ALL PERSONNEL FROM T...

Страница 3: ...LE OF CONTENTS 3 2 READ FIRST 4 3 EQUIPMENT DESCRIPTION 6 4 UNPACKING 7 5 INSTALLATION 9 6 INITIAL START UP 10 7 OPERATION 11 8 CLEANING MAINTENANCE PROCEDURES 12 9 TROUBLESHOOTING 13 10 PARTS LISTS 1...

Страница 4: ...AND OR DAMAGE TO EQUIPMENT UNIT MUST BE INSTALLED IN ACCORDANCE WITH ALL APPLICABLE CODES NOTICE The data plate is behind the access panel under the controls The oven voltage wattage serial number wi...

Страница 5: ...this or any other LANG appliance must be performed by qualified personnel only Consult your authorized service station directory or call the factory at 1 800 224 LANG 5264 or WWW LANGWORLD COM For th...

Страница 6: ...avity dimensions are 29 73 5 cm wide x 20 50 8 cm high x 23 58 4 cm deep The oven comes standard with four chrome plated racks The interior of the oven is constructed of stainless steel Operation The...

Страница 7: ...EEDED OR EMPLOY APPROPRIATE MATERIALS HANDLING EQUIPMENT SUCH AS A FORKLIFT DOLLY OR PALLET JACK TO REMOVE THE UNIT FROM THE SKID AND MOVE IT TO THE PLACE OF INSTALLATION CAUTION ANY STAND COUNTER OR...

Страница 8: ...in the bottom of the upper deck Screw in half way While aligning the locating pins with the holes place the upper deck on top of the lower deck and lower the oven into position Wire is supplied for m...

Страница 9: ...efore proceeding with the installation NOTICE The installation of any components such as a vent hood grease extractors fire extinguisher systems must conform to their applicable National State and loc...

Страница 10: ...t to 350 degrees and allowing the oven to heat until all vapor and condensation has been eliminated For best operating results allow the oven to thoroughly dry out This may take up to 8 hours TEMPERAT...

Страница 11: ...en doors during baking as this will change the baking characteristics of the oven and make it difficult to determine a final program If the product is overdone on the outside and underdone on the insi...

Страница 12: ...t tint may be removed using Lang Mfg Carbon Release 72804 32 oven cleaner Always apply these cleaners when the oven is cold and rub in the direction of the metal s grain CALIBRATION Calibration Check...

Страница 13: ...efer to the TEST section and locate the Possible Cause then refer to test to identify test procedures SYMPTOM POSSIBLE CAUSE Power indicator is not lit Tripped circiut breaker Failed power cord or plu...

Страница 14: ...esentative Possible Cause TEST Product is cooked too long No test available operational condition Failed Thermostat Confirm that thermostat is getting 240 volts Failed element Remove the wires and che...

Страница 15: ...75 Amp 30500 11 Contactor 3 Pole 30700 03 Transformer 31400 17 Pilot Light 31601 01 Circuit Breaker 31800 04 Circuit Breaker 31800 07 Rack F11 Oven 50200 51 Rack Slide F11 oven 50200 54 Door Handle C...

Страница 16: ...16 WIRING DIAGRAM...

Страница 17: ...arranty period As to warranty service in the territory described above Lang will absorb labor and portal to portal transportation costs time mileage for the first 12 twelve months from the date of ins...

Отзывы: