100 (101)
ENG
Delivery/installation checklist:
Was the tub packaging unbroken upon delivery?
Was there any visible damage to the tub when unpacking (panels, shell, lid)?
Read the spa tub manual carefully.
Has the tub base been prepared in accordance with Landskaps' instructions?
Install the tub in accordance with Landskaps' instructions.
Check that all pump joints are tightened before filling with water.
Check that no leaks occur during filling.
Power up the tub and allow the system to configure itself (about 5 min).
Test the water balance and adjust if necessary in accordance with the instructions
on the chemical products.
Содержание AMIATA Vital +
Страница 21: ...21 101 SE...
Страница 41: ...41 101 DK...
Страница 61: ...61 101 NO...
Страница 81: ...81 101 FI...
Страница 101: ...101 101 ENG...