PROCEDURE FOR INSTALLATION:
1. Prepare proper concrete slab as required. See Fig. 2 and Fig. 3 for conduit spacing
requirements.
Note:
DO NOT DRAG unit across concrete or other rough surfaces. This could damage the finish.
Units are heavy! Dining height table weighs 345lbs, Standing height table weighs 385lbs and
Standing height with canopy weighs 755lbs. Proper lifting equipment is required. Unit ships fully
assembled, except for side access panels.
UNCRATE PRODUCT:
1. Leave product in shipping crate and deliver close to installation site.
2. When ready to move product into position to start installation, carefully uncrate the product
by removing the screws – marked on the crate with bright colored paint. See Fig. 1.
For SURFACE MOUNT: leave footpads installed.
1. Set unit in position.
2. If unit needs to be leveled, use additional foot pad material as shim, covering as much surface
area as possible to keep unit stable.
3. Measure inside spacing as noted in Fig. 3. Adjust unit as necessary to achieve noted spacing.
Mark hole locations, see Fig. 2.
4. Move unit to gain access to hole locations.
5. Drill holes according to Fig. 4. Clear holes of all debris using compressed air and wire brush.
6. Fill holes with epoxy as directed by epoxy manufacturer.
7. Install concrete grip anchors so top of anchor is flush or just below grade.
8. Move unit in position.
9. Install threaded rods, washers and nuts as shown in Fig. 4. Do not tighten fully until epoxy has
cured.
10. Make wiring connections, if necessary.
11. For units that are wired/solar: install screw and star washer with grounding pigtail to side
access panel before installing panel, see Fig. 7 and Fig. 8.
12. Install side access panel. Align pins in panel with the notches along the sides of the frame.
Push panel in and then slide down to secure, see Fig. 9.
13. Install cover plate: Clean area shown in Fig. 10A. Snap 3M primer ampule and apply primer
liberally in area outlined in Fig. 10A. Allow to dry completely, approx. 5 min at room temp.
Remove red membrane from both sections of VHB tape on cover plate. Visually align the plate
in opening and press cover plate in place, see Fig. 10B. Apply pressure to both ends for
approximately 15 seconds.
ASSEMBLE WITH CARE!
Pangard II
Polyester Powdercoat is a strong, long-lasting finish. To protect this finish
during assembly, place unwrapped powdercoated parts on packaging foam or other non-marring surface. Do
not place or slide powdercoated parts on concrete or other hard or textured surface – this will damage the finish
causing rust to occur. Use touch-up paint on any gouges in the finish caused by assembly tools.
Tools Required:
•
Safety glasses
•
Hammer drill with Ø5/8” masonry bit
•
3/4” wrench
•
Flat blade screwdriver
•
Phillips screwdriver
•
Non-marring pry bar
•
Wiring connectors
•
Epoxy anchoring system
•
Compressed air and wire brush for clearing anchor holes
•
Conduit as required by local code for Fig. 3 connection.
Installation Guide
GO Outdoor Table
www.landscapeforms.com Ph: 800.521.2546
Date: September 26, 2019
Page 1 of 6
Standing height table
Standing height table,
With canopy
Standing height table,
With canopy, solar
Included components:
Dining height table
1X – Hardware pack of grounding components, if unit is wired/solar
2x - Side access
panel
2x - Cover plate
2x - Foot pad
4x - Concrete
grip anchor,
½-13
4x –
threaded
rod, ½-13 x
3-1/2”
4x – hex nut,
½-13
4x – washer,
½”
1x – 3M
primer 94