background image

ASSEMBLE WITH CARE!

Pangard II

Polyester Powdercoat is a strong, long-lasting finish.  To 

protect this finish during assembly, place unwrapped powdercoated parts on packaging foam or 

other non-marring surface.  Do not place or slide powdercoated parts on concrete or other hard or 

textured surface – this will damage the finish causing rust to occur.  Use touch-up paint on any 

gouges in the finish caused by assembly tools.

1. Remove top retaining screws, top casting, optional plastic sleeve, and cover 

ring from bollard to be mounted.  See Fig. 1 and Fig. 5.

PROCEDURE FOR EMBEDDED INSTALLATION, WITHOUT LIGHT:
2. Embed bollard tube in a concrete footing that meets local frost conditions. 

Be sure to allow for proper drainage. See Fig. 2 and Fig. 3.

3. Clean concrete from bollard tube before it sets. Allow concrete to cure.
PROCEDURE FOR INSTALLATION WITH LED LIGHT:
1. Complete steps 1-6 for surface mount installation or steps 1-3 for 

embedded.

2. WITH POWER OFF

, connect fixture wires to supply wires using approved 

local electrical code standard connectors.

PROCEDURE FOR SURFACE MOUNT INSTALLATION, WITHOUT LIGHT:
2. Place bollard in the desired position and mark hole locations. See Fig. 6.

3. Move bollard to allow access for drilling holes.. 

4. Drill holes at marked locations according to anchor manufacturer’s 

specification.

5. Clear holes of debris.

6. Complete the anchor installation according to the anchor manufacturer’s 

instructions.

FINAL INSTALLATION STEP:

1. Assemble remaining components.  Align holes in top casting with threaded 

holes for retaining screws. Retaining screws should pass through holes in 

top casting.

PROCEDURE FOR SOLAR LIGHT INSTALLATION:

1. See page 3.

3/16” hex key (for non-solar bollard without sleeve)

1/4” hex key (for non-solar bollard with sleeve)

Surface mount bollard:  The surface mount bollard has a 3/8” thick mounting plate 

that can accept 4 anchors up to 1/2” dia. thread size.  If stud anchors are used, select an 

anchor length that allows the stud to extend 1” above the mounting surface. Non-

corrosive anchoring hardware recommended.

rebar for footing, if required

drain tubing to engineered fill, if required

Tools Required

Installation Guide

Annapolis 

Bollard

www.landscapeforms.com      Ph: 800.521.2546

Date: March 3, 2022

Page 1 of 4

6in 

surface 

mount

6in 

embedded

6in 

removable

12in 

embedded

CAUTION! 

Fixtures and wiring must be installed in accordance with local codes and 

ordinances. Do not install lighted bollards within 10 feet of a pool, spa, or fountain.

NOTES:

Locate bollard where solar light receives a minimum of 4 hours of direct sunlight per 

day.  Avoid locations that would become shaded as the path of the sun changes with 

the seasons.  Solar powered light is not suitable for installation at latitudes greater 

than 50 degrees.

Landscape Forms is not responsible for site preparation, footings, or electrical wiring.

The solar light should not be activated until the bollard is ready to be installed in a 

location where it will receive required exposure to sunlight.

Failure to allow for proper drainage may void the standard Landscape Forms 

warranty.

WARNING!: 

LED cartridge and driver are not rated for connection or 

disconnection while energized. Doing so may damage LEDs and will void the 

warranty.  Disconnect incoming power before making or breaking any electrical 

connections.

Отзывы: