![Landis+Gyr 3 SMETS2 Скачать руководство пользователя страница 80](http://html1.mh-extra.com/html/landis-gyr/3-smets2/3-smets2_user-manual_673710080.webp)
80/143
Issue 1.2
Supply control switch
© Gyr
D000058620 en a
– E470 Series 3 SMETS2 100 mm – ZCX310 – User Manual and Functional Description
2.
Press button A briefly (< 2 s) again.
The PIN entry dialogue is then displayed.
E n t e r P I N
A = i g n o r e B = y e s
3.
Press button B briefly (< 2 s).
E n t e r P I N
X X X X
Enter your customer privacy PIN, (the A button increments the
highlighted digit, the B button moves to the next digit) offer the pin
entry by pressing and holding button B longer (
≥ 2 s).
On successful PIN entry, the Credit mode status display will be shown.
4.
Press the B button briefly (<2s) from the credit status screen.
The Enable Supply display will be shown
C R P r e s s B f o r
E l e c
import
import
5.
Press and hold button B longer (
≥ 2 s).
E n a b l e s u p p l y ?
B = y e s A = n o
6.
The customer premises are reconnected by switching on the supply
control switch. A reconnect message appears.
S u p p l y e n a b l e d
import
import
11.3.3 Reconnection when in prepayment mode
The processes described above are also applicable when the meter is in
prepayment mode of operation. The only difference to observe will be the
Prepayment Status display rather than the Credit status display as
described.
11.4 Load limit restoration period
Where Load Limiting has been initiated then the meter can perform
reconnection without manual intervention if a load limit restoration period
has been configured.
The load limiting restoration period is the length of time in seconds after the
Supply has been armed following a load limiting event before the supply is
enabled.