17
Section 1: Assembly & Set-up
NTS2607, NTS2609, & NTS2611 No-Till Seeder 329-141M
9/10/20
5. Unscrew greasable pivot bolt (#7) and remove
all seed drive sprocket with lockout clutch (#5). Keep
greasable pivot bolt (#7) inserted in drive sprocket.
6. Slide snap-on actuator (#9) over hub of lockout
sprocket (#5).
7.
Attach sprocket and actuator assembly (#5 & #9) to
bracket “B” with pivot bolt (#7). Tighten 5/8"-11 GR8
pivot bolt (#7) to the correct torque.
8. Attach Counter Pickup (#3) to pickup mount (#8) with
8-32 x 1 1/2" round head screws (#12) and flat
washer (#23).
9. Secure screws (#12) with flat washers (#23), lock
washers (#22), and hex nuts (#17). Draw nuts up
snug, do not tighten at this time.
10. Attach ground cable eyelet “C” to back side of
mount (#8) with 8-32 x 1/2" round head screw (#11),
flat washer (#23), lock washer (#22), and nut (#17).
Tighten hex nut to the correct torque.
11. Attach mount (#8) to the back side of bracket “A” by
inserting 1/4"-20 x 3/4" GR 5 bolts (#14) through
bracket “A”, mount (#8), lock washers (#19) and hex
nuts (#16). Tighten hex nuts to the correct torque.
12. Adjust counter pickup (#3) to be 1/8" above the
highest surface on snap-on actuator (#9) and tighten
nuts (#17) to the correct torque.
13. Attach Acremeter console (#1) to the seedbox side
panel with 8-32 x 1" round head screws (#13), flat
washers (#23), lock washers (#22), and nuts (#17).
Tighten hex nuts to the correct torque.
Acremeter Option Assembly
Figure 1-8
73357
14. Install roller chain (#27) on drive sprocket (#4) and the
all-seeds drive sprocket (#5).
15. Adjust chain take-up with idler sprocket (#2) and
tighten nut (#18) to the correct torque.
16. Install roller chain (#28) on the all-seeds drive
sprocket (#5) and driven sprocket (#29).
17. Adjust chain take-up with idler sprocket (#24) and
tighten nut (#18) to the correct torque.
18. Secure electrical cables “C”. “D” & “E” to pickup mount
(#8) with cable ties (#10). Two other cable ties are
available for securing the wiring away from the
sprockets and roller chains.
19. Connect cable ends D&E together.
20. Make sure wiring is clear of chains, sprockets, and
possible pinch points. Make any necessary
adjustments to the cable layout and then tighten zip
ties (#10).
21. For additional instructions, refer to the included
Acremeter instruction sheet.
22. Attach lower guard (#6) with bolts (#15) and flat
washers (#21). Tighten bolts to the correct torque.
23. Attach upper guard (#26) with hand knobs (#25),
bolt (#15), lock washer (#21), and flat washer (#20).
Tighten bolt (#15) to the correct torque. Hand tighten
knobs.