Instructions for the installer
349
4. Final operations
4.1
Levelling the cooker to the floor
After having made the electrical and gas hook-ups, level the cooker to the
floor using the adjustable feet that were previously screwed onto the bottom
of the cooker.
Should it be necessary to drag the cooker,
screw the feet in completely and carry out the final
regulation only when the other operations are completed.
4.2
Adjustment of the drawer height
The clips of height adjustment are located in the
lower side and at the right and left ends of the
drawer.
By turning the lever
A
the drawer will raise of
3 mm
.
Содержание MAESTRO
Страница 1: ...Gebruiksaanwijzing Gebrauchsanweisung Manuel d utilisation Manuale d uso Instruction manual...
Страница 2: ......
Страница 3: ...NEDERLANDS 5 83 DEUTSCH 85 163 FRAN AIS 165 243 ITALIANO 245 323 ENGLISH 325 403...
Страница 11: ...Aanwijzingen voor de installateur 11 GENESI ASCOT...
Страница 91: ...Anweisungen f r den Installateur 91 GENESI ASCOT...
Страница 171: ...Instructions pour l installateur 171 GENESI ASCOT...
Страница 251: ...Istruzioni per l installatore 251 GENESI ASCOT...
Страница 331: ...Instructions for the installer 331 GENESI ASCOT...
Страница 407: ......