3.7.3.3 FN30 power supply
The power supply unit FN30 can only be used to operate the F300K on an AC mains voltage
within the scope of EN 60950 or UL 60950.
The power supply is available in two versions:
•
For top-hat rail mounting
•
As a built-in unit in a housing
When connecting the F300K to the FN30-00 power supply, not all wires of the connection ca-
ble are connected to the power supply connections. Surplus wires must be connected to sep-
arate terminals. These terminals are part of the housing.
Technical data for this power supply unit can be found in section
.
3.7.4
Coupling relays
To connect the contact outputs of the F300K to voltages higher than 42 V or voltages without
protective separation, you have to use coupling relays. These must met the protective sepa-
ration requirements. See section
6.1.2 Electrical Safety – Requirements to Be Met by Third-
In addition, you also require appropriate certification for the coupling relay with a safety con-
tact output (flame signal) for the purpose for which it is to be used (e.g. to EN 298 and/or to
EN 61508 with SIL III or SIL II).
The LAMTEC FN20 and FN30-20 power supply has coupling relays for the flame signal.
These meet EN 298 und EN 61508-2 SIL 2 requirements.
If you want suitable coupling relays or have any questions, please contact our support staff at
[email protected] or on +49 (0) 6227 6052-33.
3.7.5
Adjustable Holder, Cooling-air Housings
You will find a complete overview of the holders and cooling-air housings for LAMTEC flame
scanners in the document "Flame Monitoring Systems and Accessories" (DLT7673).
Fig. 3-9 FN30-00 top-hat rail mounting
Fig. 3-10 FN30-10 as a built-in unit
Содержание F300K Series
Страница 1: ...www lamtec de Sensors and Systems for Combustion Engineering Manual F300K Compact Flame Scanner ...
Страница 2: ......
Страница 26: ...25 5 User Interface 5 2 Menu tree ...
Страница 31: ...30 6 Commissioning Marking information on the device Example F300K F300K UI FB30 Warning e g ...
Страница 46: ...45 6 Commissioning The data has now been determined and sent to the flame scanner Fig 6 21 Successful transfer ...
Страница 121: ...120 14 Appendix 14 3 EU Declaration of Conformity ...
Страница 122: ...121 14 Appendix ...
Страница 125: ...124 14 Appendix ...