
26
5
Commissioning
5.1.15
Set pilot burner (maintenance mode)
Select parameter no. 787
No
FMS
ETA
Short Text
Description
Min
Max
Default
787
1
1
Wartung
Maintenance mode (control unit only until stabilization
time)
0
2
0
0 = maintenance mode on (main valves are opened)
1 = maintenance mode active
2 = curve set switch allowed in set mode
Set the maintenance mode with this parameter. The
maintenance mode sets the pilot burner or the ignition
flame monitor. It enables to do 5 consecutive ignition
attempts without restarting with pre-ventilation and the
leakage test. The burner sequencer only steps up to the
flame stabilisation time. You may not open the main
valves before the reset of this parameter.
After the 5
th
attempt pre-ventilation and leakage start
automatically.
Note:
A "Total Reset" resets the counter for maintenance
mode automatically i.e. the next cycle is treated as the
first and pre-ventilation and the leakage test are run-
ning.
Therefore, reset faults with a "Partial Reset" wherever
possible (selection switch on "Status", first channel key
2 upwards, then in addition channel key 1 downwards).
Attention:
You may not use a partial reset for some
faults.
Содержание ETAMATIC
Страница 1: ...Manual ETAMATIC ETAMATIC S CE 0085 AU 0207 Sensors and Systems for Combustion Engineering...
Страница 2: ......
Страница 7: ...6 Table of Contents 9 27 Dimensions and weight 128 9 28 Declaration of Conformity 131...
Страница 65: ...64 8 Control Mode 8 2 1 Leakage test flow chart Fig 8 4 Flow chart leakage test...
Страница 69: ...68 8 Control Mode Switching in standby via LSB module Fig 8 7 Switching in Standby mode via LSB module...
Страница 90: ...89 9 Appendix 9 8 Process Sequence Charts Fig 9 3 Process sequence chart gas with pilot burner...
Страница 91: ...90 9 Appendix Fig 9 4 Process sequence chart oil with pilot burner...
Страница 92: ...91 9 Appendix Fig 9 5 Process sequence chart gas without pilot burner...
Страница 93: ...92 9 Appendix Fig 9 6 Process sequence chart oil without pilot burner...
Страница 98: ...97 9 Appendix 9 9 Connection Diagrams Fig 9 7 ETAMATIC wiring diagram with ignition flame monitoring...
Страница 99: ...98 9 Appendix Fig 9 8 ETAMATIC S wiring diagram with ignition flame monitoring...
Страница 104: ...103 9 Appendix Fig 9 16 LSB connection ETAMATIC LT1 other LAMTEC devices...
Страница 134: ...133 9 Appendix...
Страница 135: ......