background image

(14523/14524) PRO-Modbus 

  

 

     Manual

Manual
Wind Sensors PRO-Modbus (14523/14524)

1. 

Warranty

Please note the loss of warranty and non-liability by unau-
thorised manipulation of the system. You need a written 
permission of the LAMBRECHT meteo GmbH for changes 
of system components. These activities must be operated 
by a qualifi ed technician.

The warranty does not cover: 

1.   Mechanical damages caused by external impacts (e. g. 

icefall, rockfall, vandalism).

2.   Impacts or damages caused by over-voltages or elec-

tromagnetic fi elds which are beyond the standards and 
specifi cations in the technical data. 

3.   Damages caused by improper handling, e. g. by wrong 

tools, incorrect installation, incorrect electrical installation 
(false polarity) etc.

4.   Damages which are caused by using the device beyond 

the specifi ed operation conditions. 

2. 

Initial operation

The wind can be represented by a vector quantity. For a 
complete description of the wind it is necessary to specify 
its speed and direction. The two components are subject to 
spatial and temporal variations; thus, strictly speaking, they 
are valid only for the site where the measuring instrument is 
put up. We therefore recommend to select the place of instal-
lation very carefully.

Selecting the place of installation

Generally, wind measuring instruments should not measure 
the specifi c wind conditions of a limited area, but indicate the 
typical wind conditions of a wider area. The values measured 
at diff erent places must be comparable.
Thus, when installing the sensor you should make sure the 
place of installation is not under the lee of great obstacles. 
The distance between the obstacles and the sensor should 
be 10 times the height of the obstacles (this corresponds to 
the defi nition of an undisturbed terrain). 
If an undisturbed terrain of this kind does not exist the sensor 
must be put up at a height of at least 5 m above the obstacle 
height.
If the sensor must be installed on a roof top the place of instal-
lation must be in the middle of the roof to avoid predominant 
wind directions.
If you want to measure both wind direction and wind speed, 
install the sensors at the same measuring point, if possible, 
and make sure to avoid any mutual infl uence of the sensors.
A wind sensor pair easily meets this requirement since the 
sensors are set up side by side. Their horizontal distance 
should be approximately 1.5 m. The two sensors must be 
staggered vertically so that the lower edge of the upper wind 
speed sensor is 0.1 to 0.5 m above the upper edge of the lower 
wind direction sensor.

Mounting of the cup rotor and the wind vane at the 
sensor

The bores at the cup rotor and the wind vane are attached in 
such a way that they can only be installed in a certain clear 
position. All 3 screws must be used to fasten the cup rotor 
resp. the wind vane. Thus the correct direction of rotation is 
guaranteed. The necessary wrench is included in delivery.

3. 

Maintenance

The sensor design permits long periods of maintenance-free 
operation. 
We recommend a regular visual verifi cation and functional test 
of the wind sensors as well as a sensor calibration of both 
sensor types at intervals of 2 years.
With problems, which you cannot solve, do not hesitate to 
contact our LAMBRECHT meteo service under: 
Tel.: 

+49-(0)551-4958-0 

Fax:  

+49-(0)551-4958-327

e-mail:   [email protected]

1

Halbrundschraube mit
Innensechskant

round head screw with

hexagon socket

M3x8 DIN7380

2

Schalenstern / cup rotor

3

Schalensternglocke / cup rotor

protective globe

4

Skt-Stiftschlüssel / hex head

wrench

4

2

3

1

3

1

4

2

1

Schraube mit Innensechskant
screw with hexagon socket

M3x12 DIN7380

2

Windfahne / wind vane

3

Windfahnenglocke / wind vane protective globe

4

Skt-Stiftschlüssel / hex head wrench

2

Содержание PRO-Modbus 14523

Страница 1: ...easuring range of 60 m s low starting values of 0 5 m s high resolution of measuring values very low needs of maintenance Standards EMC acc to EN 61000 6 2 EN 61000 6 4 EN 61000 4 2 3 4 5 6 11 Namur N...

Страница 2: ...an undisturbed terrain of this kind does not exist the sensor must be put up at a height of at least 5 m above the obstacle height If the sensor must be installed on a roof top the place of instal lat...

Страница 3: ...orientation select a landmark which is as far as possible up north with regard to the nal position of the wind direction sensor The reference point can be selected using a topographical map 1 25000 T...

Страница 4: ...14523 14524 PRO Modbus Manual Manual Wind Sensors PRO Modbus 14523 14524 8 Wiring diagram 4...

Страница 5: ...14523 14524 PRO Modbus Manual Manual Wind Sensors PRO Modbus 14523 14524 9 Dimensional drawings Accessory optional Mast adapter Id No 32 14567 008000 5 15 P51 69 P M27x1 5...

Страница 6: ...234 is transmitted in the order 0x12 0x34 Example Big Endian 32 bit or 64 bit Register size value 32 bits 0x12345678 is transmitted in the order 0x12 0x34 0x56 0x78 10 2 Device address The addresses 1...

Страница 7: ...mal place INT 30202 Wind direction average value since last retrieval 10 1 decimal place INT 30203 Wind direction maximum value 10 1 decimal place INT 30204 Wind direction minimum value 10 1 decimal p...

Страница 8: ...tocon guration is started with the data logger met LOG it queries the available mapping registers on each COM interface in the device address range 1 25 For this purpose the number of mapping register...

Страница 9: ...Big Endian WORD 31592 Global radiation instantaneous values Low WORD uncompensated 0x04 Big Endian WORD 10 8 1 Mapping register PRO Modbus Register address Register value Unit Factor Description 4600...

Страница 10: ...delivery 1 sensor without cable Connectable to Lambrecht meteo data loggers power supply units user speci c evaluation systems not included in delivery Parameters Wind direction 14523 Wind speed 14524...

Отзывы: