A
B
D
C
E
F
G
A
D
E
The Next Generation Professional Whelping Box
Assembly Instructions
Parts List:
A
– Box Side Wall (x2)
B
– Box Rear Wall
C
– Box Front Wall
D
– Short Puppy Rail (x2)
E
– Long Puppy Rail (x2)
F
– 1/3 Door
G
– 2/3 Door
STEP 1:
Find an open area, unpack the box (retain for
future storage), and identify each of the parts as
shown to the right. (Items D & E may appear
different based on the size of your whelping box.)
Remove door items F & G from Front Wall (C).
STEP 2:
- Skip to Step 4 if not using Puppy Rails
Stand up one Side Wall (A) and one Long Puppy Rail
(E) (Fig. 1) and insert the hooks from the puppy rail
into the matching slots on the side wall. (Fig. 2) Slide
to lock. Repeat for second Side Wall.
Note: Distance from the edge of the side wall to the
puppy rail should be the same on each end of the side
wall. (Fig. 3) If the distance is not the same, (Fig. 4)
remove the puppy rail, rotate 180 degrees and
reinsert.
STEP 3:
Repeat Step 2 for the Front Wall (C), Rear Wall (D),
and the Short Puppy Rails (D).
Note: The distance from the edge of the front/rear wall
to the puppy rail will be greater than Step 2 (Fig. 3),
but should still be equal on both ends of the puppy rail.
Fig. 1
Slot
Hook
Insert
S
lide
t
o
Lo
ck
No
Tools
Required
Made in the U.S.A.
Correct
– Same
space on both
sides of puppy rail
Incorrect
–
Space is
not equal on both
sides of puppy rail.
Rotate puppy rail
180 degrees