Initial Operation
Daily Start-up
23
Laird Thermal Systems s.r.o
Operation Manual, 387009851
Date: 08/09/2022
Version: 1.0
Liquid-Air Cooling Unit LA 5000
387009381
1)
Remove the cap on the coolant container.
2)
Switch on the unit and let it run for about 10 minutes in order to fill and vent the cooling circuit.
Continously check the filling level during this procedure.
CAUTION
Lack of coolant may destroy the pump!
When looking into the filling plug of the coolant container the filling level must always be above the heat
exchanger fins.
3)
If required, refill coolant.
4)
Check the compliance with the operational parameters as specified on page 16.
5)
Remount cap on coolant container.
6)
Switch off the unit.
The unit is ready for operation.
6.3 Daily Start-up
Switch on the unit about 1 minute prior to using the equipment that is to be cooled.
6.4 Setting to work after Storage
Setting to work after storage will have to follow the same procedures as required for initial operation (see
chapter 6.2).