16
PXl16 Sheartec:II Planer \ Setup
Setup
Setup Overview (MUST READ)
When setting up your PXl16 Sheartec:II Planer, please take a moment to read this overview prior to
starting.
The machine comes mostly assembled. You will have to assemble the leveling feet, the dust chute, and
calibrate the height.
After Setup, There may be a few adjustment to be made. All of these adjustments are done prior to shipping
the machine, but if additional adjustments are required, please follow the adjustment guides.
If you have any doubt about the described procedure, seek professional assistance. Do not
attempt any procedure that you feel is unsafe, or that you do not have the physical capability of achieving.
Placement & Unboxing
Your Machine will likely be delivered by a third party delivery service. Before unpacking your new machine,
first inspect the packaging, the invoice, and the shipping documents supplied by the driver. When unpacking
your machine, separate all enclosed items from the packing materials and inspect them for damages.
Ensure that there is no visible damage to either the packaging or the machine BEFORE the driver leaves.
Save all packaging materials until you are satisfied with the machine and/or have resolved any issues
concerning any missing or damaged items.
NOTICE!
·
ALL SHIPPING DAMAGE MUST BE NOTED UPON DELIVERY AND SIGNED BY THE OWNER AND THE DELIVERY DRIVER.
IF YOU FIND ANY DAMAGED ITEMS IN YOUR PACKAGE, YOU MUST CONTACT LAGUNA TOOLS TO FILE A COMPLAINT.
IN ORDER TO RETURN DAMAGED GOODS UNDER THE LIMITED WARRANTY TO LAGUNA TOOLS, INC., YOU MUST HAVE
THE ORIGINAL PACKAGING. ALL CLAIMS OF LOSS OR DAMAGED GOODS MUST BE REPORTED TO LAGUNA TOOLS
WITHIN 24 HOURS OF DELIVERY. PLEASE CONTACT THE LAGUNA TOOLS, INC. CUSTOMER SERVICE DEPARTMENT TO
MAKE CLAIMS FOR ANY DAMAGED ITEMS/PARTS.
·
IT IS PROBABLE THAT YOU WILL FIND SAWDUST WITHIN YOUR MACHINE. THIS IS BECAUSE THE MACHINE HAS
BEEN TESTED PRIOR TO SHIPMENT FROM THE FACTORY AND OR LAGUNA TOOLS. WE TEST MACHINES PRIOR TO
SHIPPING TO CUSTOMERS, BUT MOVEMENT CAN TAKE PLACE DURING TRANSPORTATION. SOME ADJUSTMENTS
MAY HAVE TO BE UNDERTAKEN BY THE CUSTOMER. THESE ADJUSTMENTS ARE COVERED IN THE VARIOUS
SECTIONS OF THIS MANUAL.
Placement
Before you remove your machine from the packaging, select the area where you will use your machine.
There are no hard and fast rules for its location, but below are a few guidelines:
1. There should be sufficient area at the front of the machine to allow you to work on it comfortably.
2. There should be sufficient area at the back of the machine to allow access for adjustments and
maintenance to be conducted.
3. Adequate lighting. The better the lighting the more accurately and safely you will be able to work.
4. Solid floor. You should select a solid flat floor, preferably one made of concrete or something similar.
Содержание Sheartec:II PXl16
Страница 1: ...PXl16 Sheartec II Planer Owner s Manual MPLANPX16 0130 3 10 2021...
Страница 24: ...24 PXl16 Sheartec II Planer Setup Assembling FIGURES 10 12 DRO ADJUSTMENT...
Страница 36: ...36 PXl16 Sheartec II Planer Wiring Wiring WARNING REVIEW ELECTRICAL SAFETY PRIOR TO ANY WIRING PROCEDURES 9...
Страница 37: ...37 PXl16 Sheartec II Planer Replacement Parts Diagram Replacement Parts Diagram Cutterhead Drivetrain...
Страница 38: ...38 PXl16 Sheartec II Planer Replacement Parts Diagram Table Lift...
Страница 39: ...39 PXl16 Sheartec II Planer Replacement Parts Diagram Stand Motor...
Страница 47: ...47 PXl16 Sheartec II Planer Warranty...