PX-22 SHEARTEC II PLANER
26
Unboxing & Placement
Your machine will likely be delivered by a third-party delivery service. Before unpacking your new machine, first
inspect the packaging, the invoice, and the shipping documents supplied by the driver. When unpacking your
machine, separate all enclosed items from the packing materials and inspect them for damages. Ensure that there
is no visible damage to either the packaging or the machine
BEFORE
the driver leaves. Save all packaging
materials until you are satisfied with the machine and/or have resolved any issues concerning any missing or
damaged items.
NOTICE!
ALL SHIPPING DAMAGE MUST BE NOTED UPON DELIVERY AND SIGNED BY THE OWNER AND
THE DELIVERY DRIVER. IF YOU FIND ANY DAMAGED ITEMS IN YOUR PACKAGE, YOU MUST CONTACT
LAGUNA TOOLS TO FILE A COMPLAINT. IN ORDER TO RETURN DAMAGED GOODS UNDER THE LIMITED
WARRANTY TO LAGUNA TOOLS, INC., YOU MUST HAVE THE ORIGINAL PACKAGING. ALL CLAIMS OF LOSS
OR DAMAGED GOODS MUST BE REPORTED TO LAGUNA TOOLS WITHIN 24 HOURS OF DELIVERY.
PLEASE CONTACT THE LAGUNA TOOLS, INC. CUSTOMER SERVICE DEPARTMENT TO MAKE CLAIMS FOR
ANY DAMAGED ITEMS/PARTS.
IT IS PROBABLE THAT YOU WILL FIND SAWDUST WITHIN YOUR MACHINE. THIS IS BECAUSE THE
MACHINE HAS BEEN TESTED PRIOR TO SHIPMENT FROM THE FACTORY AND OR LAGUNA TOOLS. WE
TEST MACHINES PRIOR TO SHIPPING TO CUSTOMERS, BUT MOVEMENT CAN TAKE PLACE DURING
TRANSPORTATION. SOME ADJUSTMENTS MAY HAVE TO BE UNDERTAKEN BY THE CUSTOMER. THESE
ADJUSTMENTS ARE COVERED IN THE VARIOUS SECTIONS OF THIS MANUAL.
Placement:
Before you remove your machine from the packaging, select the area where you will use your machine. There are
no hard and fast rules for its location, but below are a few guidelines:
1.) There should be
sufficient area at the front
of the machine to allow you to work on it comfortably.
2.) There should be
sufficient area at the back
of the machine to allow access for adjustments and maintenance
to be conducted.
3.
Adequate Lighting:
The better the lighting the more accurately and safely you will be able to work.
4.
Solid floor:
You should select a solid flat floor, preferably one made of concrete or something similar.
5.)
Power Source:
Locate it close to a power source and dust collection.
6.)
Storage Area:
Allow an area for the storage of blanks, finished products and tools.
UNBOXING:
THE MACHINE WEIGHS 865 LBS (393 KG). ENSURE THAT YOU HAVE ENOUGH PEOPLE
TO DO THE JOB SAFELY.
IF YOU HAVE ANY DOUBT ABOUT THE DESCRIBED PROCEDURE, SEEK PROFESSIONAL ASSISTANCE.
DO NOT ATTEMPT ANY PROCEDURE THAT YOU FEEL IS UNSAFE, OR THAT YOU DO NOT HAVE THE
PHYSICAL CAPABILITY OF ACHIEVING.
This step requires a forklift. The PX-22 is heavy, be careful when lifting and handling it! Failure to comply may cause
serious injury and/or damage to the machine and/or property! Use a forklift to remove PX-22 from pallet and place
on floor.
NOTE:
Another option to remove the planer from the pallet is to attach the included hooks to frame of machine at
each of the four corners (Fig. 1). The hooks and bolts are included in the hardware kit. The machine can then be
Содержание SHEARTEC II PX-22
Страница 2: ......
Страница 6: ...PX 22 SHEARTEC II PLANER 6 Laguna Tools 2022 ...
Страница 9: ...General Information 9 ...
Страница 10: ...PX 22 SHEARTEC II PLANER 10 ...
Страница 11: ...General Information 11 ...
Страница 12: ...PX 22 SHEARTEC II PLANER 12 ...
Страница 21: ...General Information 21 ...
Страница 23: ...General Information 23 Specifications ...
Страница 27: ...General Information 27 lifted with a harness and forklift Remove and save hooks for later movement scenarios ...
Страница 34: ...PX 22 SHEARTEC II PLANER 34 ...
Страница 36: ...PX 22 SHEARTEC II PLANER 36 ...
Страница 42: ...PX 22 SHEARTEC II PLANER 42 Front Rear Precision Adjustment ...
Страница 43: ...Maintenance 43 ...
Страница 44: ...PX 22 SHEARTEC II PLANER 44 ...
Страница 45: ...Maintenance 45 ...
Страница 46: ...PX 22 SHEARTEC II PLANER 46 ...
Страница 47: ...Maintenance 47 ...
Страница 48: ...PX 22 SHEARTEC II PLANER 48 ...
Страница 49: ...Maintenance 49 ...
Страница 50: ...PX 22 SHEARTEC II PLANER 50 ...
Страница 51: ...Maintenance 51 ...
Страница 52: ...PX 22 SHEARTEC II PLANER 52 ...
Страница 53: ...Maintenance 53 ...
Страница 54: ...PX 22 SHEARTEC II PLANER 54 ...
Страница 56: ...PX 22 SHEARTEC II PLANER 56 Lubrication Regular monitoring and replacement of lubrication is needed ...
Страница 57: ...Maintenance 57 ...
Страница 58: ...PX 22 SHEARTEC II PLANER 58 ...
Страница 63: ...Maintenance 63 Troubleshooting ...
Страница 64: ...PX 22 SHEARTEC II PLANER 64 Wiring WARNING REVIEW ELECTRICAL SAFETY Pg s 6 16 PRIOR TO ANY WIRING PROCEDURES ...
Страница 65: ...Wiring 65 ...
Страница 66: ...PX 22 SHEARTEC II PLANER 66 ...
Страница 67: ...Replacement 67 Replacement ...
Страница 68: ...PX 22 SHEARTEC II PLANER 68 ...
Страница 69: ...Replacement 69 ...
Страница 70: ...PX 22 SHEARTEC II PLANER 70 Replacement Parts Table ...
Страница 71: ...Replacement 71 ...
Страница 72: ...PX 22 SHEARTEC II PLANER 72 ...
Страница 73: ...Replacement 73 ...
Страница 74: ...PX 22 SHEARTEC II PLANER 74 ...
Страница 75: ...Replacement 75 ...
Страница 76: ...PX 22 SHEARTEC II PLANER 76 ...
Страница 77: ...Replacement 77 ...
Страница 78: ...PX 22 SHEARTEC II PLANER 78 ...
Страница 79: ...Replacement 79 ...
Страница 81: ...Dealer Machinery Warranty 81 ...