background image

 

Dake Corporation 

Phone: 800.937.3253 

www.dakecorp.com

 

1809 Industrial Park Dr 

Fax: 800.846.3253 

Grand Haven, MI 49417 

 

 

 

 

 

DAKE DRILL PRESS 

 

Model SB-25V 

 

INSTRUCTIONAL MANUAL 

 

        

           *SB-25 shown. There may be slight differences.                

 

 

WARNING! 

Read and understand all instructions and responsibilities before operating. Failure to follow 

safety instructions and labels could result in serious injury.  

Содержание 977600-1V

Страница 1: ...46 3253 Grand Haven MI 49417 DAKE DRILL PRESS Model SB 25V INSTRUCTIONAL MANUAL SB 25 shown There may be slight differences WARNING Read and understand all instructions and responsibilities before ope...

Страница 2: ...ING AND INSTALLATION 9 GROUNDING INSTRUCTIONS 9 CONTROLS 10 OPERATION 11 TAPPING OPERATIONS USING REVERSE FEATURE 11 DRILL CHUCK INSTALLATION 11 INSTALLATION OF DRILL BIT 12 TOOLING REMOVAL 12 TABLE H...

Страница 3: ...to the repair work completed The standard limited warranty includes repair of the defective component part at no cost to the end user Warranty Process Subject to the conditions hereinafter set forth...

Страница 4: ...installation or failure to operate or maintain the unit in accordance with the printed instructions provided c Defects or malfunctions resulting from abuse accident neglect or damage outside of prepai...

Страница 5: ...oved by Customer Service a representative will supply a Return Material Authorization RMA number The returned item must have the provided RMA number clearly marked on the outside packaging Any item re...

Страница 6: ...Spindle Travel 5 Max Work Diameter 18 Speeds Variable Speed Spindle Speed Range 46 3 550 RPM Column Diameter 3 5 8 Table 13 3 4 x 13 3 4 Base 23 5 8 x 15 Spindle to Table 28 3 8 Spindle to Base 50 Ov...

Страница 7: ...ble to perform a hazard PPE assessment before work activity Additional Safety Warnings Keep guards in place and in working order Remove adjusting key and wrenches be in the habit of checking to see th...

Страница 8: ...or cutting tool is securely in the chuck Never place your fingers in a position where they could contact the drill or cutting tool of the work piece should unexpectedly shift Never perform any operati...

Страница 9: ...machine Do not operate until completely assembled and installed according to the instructions If any part of your drill press is malfunctioning has been damaged or broken do not operate until the part...

Страница 10: ...k to determine that it will operate properly and perform its intended function Check for alignment of moving parts and binding od moving parts Breakage of parts or mountings and or any other condition...

Страница 11: ...er is lost you will have to move this to stop to reset then to desired spindle direction Stop This is used when you would like the spindle to stop Forward This is used for standard drilling and tappin...

Страница 12: ...in to the hole to be threaded It only takes a few seconds to tap When the tap gets to the desired depth reverse the direction of the spindle and the tap will work its way out as long as it has been s...

Страница 13: ...ed down shafts Never exceed the maximum shaft diameter bit size for the machine TOOLING REMOVAL 1 Before removing the chuck or bit form the machine be sure the spindle has come to complete stop and po...

Страница 14: ...able is in the correct position tighten clamp release bolt securely Note Never swing the table if any material or fixturing is on it Only adjust when table is free of loose articles FEED DEPTH ADJUSTM...

Страница 15: ...to achieve variable speeds without having to change the belt position Only do this when machine is running a However if the desired speed can not be achieved in the current belt position it will need...

Страница 16: ...8 225 264 312 354 397 1 6 73 140 206 268 335 408 471 551 602 2 7 79 152 225 302 378 457 530 610 680 1 5 98 199 305 395 502 593 695 795 888 2 6 120 231 348 463 576 690 806 922 1 032 3 7 128 245 370 476...

Страница 17: ...e machine is LOCKED OUT and unplugged Special maintenance operations must be carried out by skilled personnel However we advise contacting DAKE The term special maintenance also covers resetting of pr...

Страница 18: ...his manual Loose spindle or motor pulley Check for wear or if pulley can be tightened Spindle bearing worn Replace bearing Chuck or quills fall out Rust inhibitor dirt debris in or on quill or spindle...

Страница 19: ...Dake Corporation 1809 Industrial Park Dr Grand Haven MI 49417 www dakecorp com 977600 1V 18 REV012021 ELECTRICAL DIAGRAM...

Страница 20: ...Dake Corporation 1809 Industrial Park Dr Grand Haven MI 49417 www dakecorp com 977600 1V 19 REV012021 EXPLODED VIEWS PART LISTS...

Страница 21: ...t 301055 12 Worm 301056 13 Collar 301057 14 Feed Handle 3x 301059 15 Lock Handle 301070 15A Lock Screw 302818 16 Feed Head 301069 17 Spindle Scale 301071 18 Feed Shaft 301073 19 Belt Adjust Handle 301...

Страница 22: ...43 Bearing 300990 43 Bearing 300989 44 Spindle 301099 45 Arbor 301101 46 Seal N A 47 Wedge 301104 48 Belt Cover Interlock Switch 300992 49 Motor 300996 50 Plexiglass Chuck Guard 300995 N A Chuck 16mm...

Страница 23: ...32 2 Lock Washer for Mounting Bracket 5 16 43644 2 Nut for Mounting Bracket 5 16 18 heavy 43911 2 Top Mounting Screw for Top Bracket 10 24 x 24 43847 2 Nut for Top Mounting Screw 10 24 43905 2 Self ta...

Отзывы: