17
16.
Shaking Diameter Adjustment (only for ZWF-111/211)
These models have an adjustable shaking stroke of
Ø
0-50mm. To adjust it, please follow the
instructions below,
16.1
Cut off the main power, remove the shaking tray. Manually turn the shaking mechanism until
the position like the picture above.
16.2
Tools needed: 17*19 spanner, 8*10 spanner, allen key (Included in accessory pack)
16.3
Turn off the unit, open the glass door, and pull platform tray out, until seeing the center of the
shaking mechanism (as illustrated)
16.4
Turn the main shaking mechanism until you see adjusting bolt (B) and safety nut (C) through
the opening.
16.5
Use the Allen key to loosen the (A) central fixing nut.
16.6
Use the 8*10 spanner to hold the (B) adjusting bolt as still, in the meantime, loosen the (C)
safety nut with 17*19 spanner
16.7
Use the 8*10 spanner to rotate the (B) adjusting bolt clockwise to increase the diameter, but
anti-clockwise to decrease.
16.8
When adjustment is done, tighten the (B) adjusting bolt and (A) central fixing nut.
Special Attention!
Power supply must be disconnected before performing the following
operations!
Special Attention!
The maximum shaking speed should decrease when the shaking stroke
is increased. Generally speaking, Max speed not exceed 200rpm at
30mm stroke, 150rpm at 40mm stroke, 120rpm at 50mm.
ZHICHENG is not liable for any damages, as a result of not comply with
the speed limits above.
Содержание ZWY-111B
Страница 23: ...20 18 Electronic Control System...