background image

  

MSD7R 

  Mobile Shears

       

     Part Number T129905

 

           

Safety, Operation & Maintenance Manual

Содержание MSD7R

Страница 1: ...MSD7R Mobile Shears Part Number T129905 Safety Operation Maintenance Manual...

Страница 2: ...nt to know the correct operating procedures of the attachment and all safety precautions to prevent the possibility of property damage and personal injury The LaBounty attachment has been designed and...

Страница 3: ...4OPERATION Before You Start 4 2 First Things First 4 2 Safety Devices You ll Need 4 2 General Rules for Safe Operation 4 3 Getting the Feel of the Attachment 4 4 Feathering the Controls 4 4 SECTION 5...

Страница 4: ...re Parts List 5 25 Service and Maintenance Procedures 5 26 SECTION 6 SCHEDULED MAINTENANCE Upper Shear Build Up and Hardsurfacing 6 2 Lower Shear Build Up and Hardsurfacing 6 4 Main Pivot Adjustment 6...

Страница 5: ...Introduction to Safety Section 1 Page 1 MSD 7R SHEARS SECTION 1 INTRODUCTIONTO SAFETY Introduction 1 2 Understand Signal Words 1 2 Safety Summary 1 3 Attachment Decals 1 4...

Страница 6: ...sure that you understand all controls and operating instructions before attempting to operate this equipment Failure to follow the safety precautions can result in personal injury death or property d...

Страница 7: ...ilroad rail Brittle material breaks or shatters instead of shearing The material being processed could become a projectile and cause injury or death DO NOT process any material in any position that ma...

Страница 8: ...g fluid under pressure can penetrate the skin causing serious injury Relieve pressure before unhooking hydraulic or other lines Tighten all connections before applying pressure Keep hands and body awa...

Страница 9: ...ntroduction to Safety Section 1 Page 5 MSD 7R SHEARS STANLEY LABOUNTY BRAND DECALS REPLACEMENT DECALSAVAILABLE UPON REQUEST SAFETY FIRST DECAL PART NUMBER 503590 INCLUDEDWITH MANUALS ATTACHMENT DECALS...

Страница 10: ...59 fax 218 834 3879 www stanleyhydraulic com Made in the U S A with Global Materials Attachment Model Serial Number Year of Manufacture Weight GREASE U S PATENT NUMBERS EPO PATENT NUMBERS 5 474 242 7...

Страница 11: ...MSD 7R SHEARS About the Attachment Section 2 Page 1 SECTION 2 ABOUTTHEATTACHMENT Model Description 2 2 Features 2 2 AttachmentTerms 2 3 Attachment Glossary 2 4...

Страница 12: ...provides easy accurate cutting at all angles High tensile high alloy abrasion resistant steel construction assures long uninterrupted service even in the harshest conditions The main pivot shaft of e...

Страница 13: ...R SHEAR NOSE PLATE MOUNTING BRACKET MAIN PIVOT GROUP PRIMARY BLADES UPPER SHEAR SHEAR STICK SHEAR BODY FRONT CYLINDER PIN GUIDE BLADE PIERCING TIP FRONTWEAR PLATE FAR SIDE REMOVABLE COVER PLATE REAR C...

Страница 14: ...tion assembly The crossover is preset at the factory and must not be tampered with Flow Control A hydraulic component used in a rotating shear that meters out the hydraulic fluid from the rotation mot...

Страница 15: ...ear The rear cylinder pin must be Pin greased according to the instructions in this manual Rotation Hydraulic drive assembly allows full 360 continuous rotation of the shear This option gives greater...

Страница 16: ...TION Shear Mounting for Skidsteer Mounts 3 2 Shear Mounting for Stick Mounts 3 2 Sheer Removal for Stick Mounts 3 3 Electrical Installation 3 4 Hydraulic Installation 3 5 Hydraulic Connection Examples...

Страница 17: ...ng bracket facing away from the cab Figure 3 3 2 Remove the bucket or other attachment following the manufacturer s recommended procedure For second member or boom mounts the stick will also need to b...

Страница 18: ...ully retract the bucket cylinder after it is de tached from the shear mounting bracket figure 3 6 4 CAREFULLY remove the hydraulic lines from the shear Trapped hydraulic pressure may be present after...

Страница 19: ...iagram figures 3 8 and 3 9 below for your type of mount 1 Install an electrical switch single pole single throw momentary type inside operators cab This could be either a push button toggle or foot sw...

Страница 20: ...4 diameter case drain line 3 Lift the boom and slowly engage the rotate function and open and close functions Watch for hydraulic oil leaks and interference 4 Follow the hydraulic start up procedure a...

Страница 21: ...MSD 7R SHEARS Page 6 Section 3 Installation HYDRAULIC CONNECTION EXAMPLE 1 FIGURE 3 11 CASE DRAIN ADDON AUXILIARY COUPLINGS FRONTVIEWOF LOADER TOPVIEWOF MOUNTING BRACKET CASE DRAIN SUPPLY LINES...

Страница 22: ...ction 3 Page 7 MSD 7R SHEARS CASE DRAIN SHEAROPEN SHEAROPEN SHEAR CLOSE SHEAR CLOSE ROTATION SUPPLY ROTATION SUPPLY CASE DRAIN FRONTVIEWOF LOADER TOPVIEWOF MOUNTING BRACKET HYDRAULIC CONNECTION EXAMPL...

Страница 23: ...age 8 Section 3 Installation HYDRAULIC CONNECTION EXAMPLE 3 FIGURE 3 13 FRONTVIEWOF LOADER TOPVIEWOF MOUNTING BRACKET CASE DRAIN SHEAROPEN SHEAR CLOSE SHEAR CLOSE SHEAROPEN CASE DRAIN ROTATION SUPPLY...

Страница 24: ...ge 9 MSD 7R SHEARS FRONTVIEWOF LOADER CASE DRAIN ADDON AUXILIARY COUPLINGS ADDON STANDARD AUXILIARY COUPLINGS CASE DRAIN SUPPLY LINES SHEAROPEN SHEAR CLOSE HYDRAULIC CONNECTION EXAMPLE 4 FIGURE 3 14 T...

Страница 25: ...ressure on the cylinder at the end of its stroke To prevent damage to the hydraulic systems the base machine hydraulic fluid must be kept at proper levels To check the fluid level open the shear jaw c...

Страница 26: ...ation Section 4 Page 1 SECTION 4 OPERATION BeforeYou Start 4 2 FirstThings First 4 2 Safety DevicesYou ll Need 4 2 General Rules for Safe Operation 4 3 Getting the Feel of the Attachment 4 4 Featherin...

Страница 27: ...FIRST 1 Ensure all safe viewing distance decals are installed and legible contact LaBounty for replacements as required 2 Have a DAILY Safety Dialog with all those with whom you work Inform them of an...

Страница 28: ...a Falling Objects Protection Structure be installed surrounding the excavator cab for all material handling applications 4 The attachment is for processing materials DO NOT use the attachment for unap...

Страница 29: ...the Getting Started Safely section of this manual and understand it The fluid nature of hydraulic power requires a special operating approach to the shear that can be described as a smooth even techn...

Страница 30: ...st 5 7 GeneralTroubleshooting Checklist 5 8 Cutting PerformanceTroubleshooting Guide 5 9 Shear Lubrication 5 12 BoltTorque Specifications 5 13 BoltTorque Guidelines 5 14 Dry BoltTorque Charts 5 15 Gui...

Страница 31: ...EDURES Before attempting any maintenance procedure read the entire Safety Manual carefully If any question arises regarding a safety or maintenance procedure contact your LaBounty dealer For the neare...

Страница 32: ...ades Measure blade gap rotate replace and shim blades according to procedures in this manual Upper Shear Inspect piercing tip wear plate and upper Refer to manual for build up hardsurface or replaceme...

Страница 33: ...mounting bracket _______ 4 Inspect connecting pins and pin retaining hardware _______ a Boom pivot pin of mounting bracket _______ b Cylinder connection pin of mounting bracket _______ c Front shear...

Страница 34: ...range _______ 2 Inspect upper shear _______ a Build up and hardsurface piercing tip _______ b Repair wear area _______ c Build up and hardsurface upper _______ 3 Inspect lower shear _______ a Build u...

Страница 35: ...l turntable bearing bolts and replace any that are loose or damaged _______ 2 Grease the turntable bearing refer to the Rotator Maintenance section for instructions _______ 3 Inspect the rotation hydr...

Страница 36: ...ks weld cracks and excessive wear LOWER SHEAR a Nose Plate Inspect for weld failure and excessive wear b Blade Seats Inspect for material cracks weld failure and excessive wear c Guide Blade Seat Insp...

Страница 37: ...seal bypass c Hydraulic lines are kinked d Hydraulic swivel seal bypass i Check the flow to the attachment and compare with the recommended flow see hydraulic letter for attachment ii Check for exces...

Страница 38: ...Perform build up and hardsurfacing on lower shear refer to maintenance procedures 6 Blade gap is uneven a Non LaBounty blades being used b Debris in blade seat behind blades c Inconsistent amount of...

Страница 39: ...ion See figure 5 1 Use premium grease No 2EP or equiva lent Grease fitting locations are indicated by GREASE decals on the shear LOCATIONON SHEAR NUMBEROF SHOTS 1 One in cylinder rod end 6 2 One in cy...

Страница 40: ...once and then replaced 4 Check all shear connecting pins and pin retaining bolts daily to ensure that they are in place and properly secured Pins that must be checked are a Main Pivot b Cylinder Rod...

Страница 41: ...sure bolts nuts and bolt holes are free of dirt oil grease and other contaminants 3 If necessary use the Capscrew Size Guide on this page to help determine the size of the bolt being in stalled 4 Use...

Страница 42: ...M10 x 1 5 53 72 M12 x 1 75 92 125 M14 x 2 146 198 M16 x 2 224 305 M20 x 2 5 435 590 M24 x 3 752 1020 M30 x 3 5 1511 2050 METRIC CLASS 10 9 DRY BOLT TORQUE CHARTS It is preferred to apply torque to th...

Страница 43: ...provided for shimming out the guide blade Four 4 are 0 023 0 53 mm thick one 1 is 0 12 3 mm thick 3 When five 5 shims have been placed between the guide blade and seat the guide blade can then be tur...

Страница 44: ...tion will extend the life of the blades however maintaining the close tolerance blade gap is not as important Never operate a shear when the blades have rounded to a 1 4 6 4 mm radius of more Maintain...

Страница 45: ...blades should be fairly even or the entire span of the blades Keep hands away while moving the upper shear Do not move upper while checking blade gap with feeler gauge 3 The amount of shims that are i...

Страница 46: ...reduce the chances of having the hardsurfacing material crack LaBounty recommends using Amalloy 814 rod or equivalent for hardsurfacing Do not use stainless hardsur face rod for LaBounty applications...

Страница 47: ...h may develop into major structural failures 8 Check temperature frequently to maintain 300 400 F 150 200 C DO NOT exceed 450 F 230 C 9 NEVER operate a shear following repairs without first allowing i...

Страница 48: ...a gap indicating how much build up is required see figures 5 8 and 5 9 2 Clean all dirt and grease from area to be built up 3 Preheat the area to be built up and the surround ing area to 300 400 F 15...

Страница 49: ...llowing process 1 Place the shear in a horizontal position and block it up about 18 high or preferred working height Use a straight edge on the inside of the shear blades and on the guide blade see fi...

Страница 50: ...ach pass of weld to relieve stress Grind off in line with cutting edges 7 Hardsurface the top side of lower 1 2 38 50 mm wide figure 5 12 using the same preheating welding and peening procedure Be sur...

Страница 51: ...c every 80 hours 5 The hydraulic manifold is equipped with a diag nostic nipple to check the pressure coming from the base machine Maintaining proper operating pres sure will result in optimum cutting...

Страница 52: ...the shear BLADE ASSEMBLY Cutting blades Guide blade All bolts and washers used to fasten blades Blade shims for lower shear blades not supplied with new blades HYDRAULIC ASSEMBLY All hydraulic hoses...

Страница 53: ...l is gap exceeds 030 75mm Check cutting blade gap refer to manual is gap exceeds 030 75mm Inspect hoses for wear and potential failure Inspect cylinder for leaks If rotator equipped Grease turntable b...

Страница 54: ...MSD 7R SHEARS Scheduled Maintenance Section 6 Page 1 SECTION 6 SCHEDULED MAINTENANCE Upper Shear Build Up and Hardsurfacing 6 2 Lower Shear Build Up and Hardsurfacing 6 4 Main Pivot Adjustment 6 6...

Страница 55: ...much build up is required see figure 6 1 2 Clean all dirt and grease from area to be built up 3 Remove all existing hardsurfacing by grinding down to the base metal before beginning build up and hard...

Страница 56: ...des Repeat steps 3 and 4 to buildup this area see figure 6 3 8 To hardsurface the area from behind the pierc ing tip to approximately the midpoint of the primary blade apply 3 or 4 beads of Amalloy 81...

Страница 57: ...e nose plate figure 6 5 Use a square or straight edges as on the upper shear to determine build up requirements on the top side of the lower shear 2 Clean all dirt and grease from area to be built up...

Страница 58: ...oximately at the midpoint of the primary blade Stagger the ends of the welds DO NOT end welds within 1 25 mm of bolt holes DO NOT undercut ends of weld Taper ends of welds into parent material with gr...

Страница 59: ...ut and remove the locknut 4 Place a chain around each end of the upper shear to an overhead hoist or forklift Put some type of protec tion between the chain and the blades on the upper 5 Raise the upp...

Страница 60: ...TION 7 ROTATOR MAINTENANCE The Rotator 7 2 BoltTorquing 7 3 Turntable Bearing Lubrication 7 4 Turntable Bearing Lubricants 7 4 Hydraulic Requirements 7 5 Crossover Relief Flow Control Manifold 7 5 Cas...

Страница 61: ...reaking material Use of the rotation feature for any other purpose may damage the rotation components and may compromise the shear warranty The rotation circuit consists of a hydraulic motor driving a...

Страница 62: ...olts and nuts with the same size and class of fastener Replacement fasteners can be ordered from your dealer or from the LaBounty Parts Department to ensure the correct part is used Unless otherwise s...

Страница 63: ...tickers to locate the fittings It is recommended to rotate bearing while greasing in order to uniformly distribute the grease and to most effectively flush out the old grease and contaminants The bear...

Страница 64: ...e to govern pressure at both motor ports The valves have been adjusted at the factory to provide optimal performance of the rotation motor The flow control valves meter out flow from the rotation moto...

Страница 65: ...ressure Contact the LaBounty Service Department for the procedure for performing this check Diagnostic fittings require a Parker PD series coupler on gauge CASE DRAIN A case drain is required because...

Страница 66: ...or ii Check cartridge valve seals for damage i Replace or reseal the hydraulic motor ii To check remove the case drain line and measure the amount of flow out of the case i Check base machine hydrauli...

Страница 67: ...machine hydraulic system 4 Rotation erratic a Crossover relieve valve cartridge is faulty b Flow control valve cartridge is faulty c Valve spool sticking in valve supplying oil d Faulty electrical si...

Страница 68: ...Department 2 A factory issued Return Material Authorization tag RMA must accompany returned product 3 Returned product found deficient by Stanley LaBounty will be replaced or repaired without charge F...

Страница 69: ...T129905 v2 2011 The STANLEY and LABOUNTY names and logos are registered trademarks of Stanley Solutions...

Отзывы: