14
4
5
8. Gas installation switch-on (for + GAS machines only)
Pz
19
"Don’t switch on the gas installation when the
boiler is under pressure ".
Before using the machine check that:
- the main electricity supply ON/OFF switch is ON;
- the main water supply tap is open .
- the gas supply tap is open.
Turn the main switch ON/OFF (
14
) to position 1.
The machine completes the operations described under “
Daily Switch-On
“.
Press and turn the gas tap knob (
19
) counter-clockwise and
repeatedly press the piezoelectric switch-on push-button (
Pz
)
until the burner under the boiler lights up.
Check through the observation window that the burner is lit
and, after a few seconds, release the knob (
19
).
“
Heating
” now begins.
At the end of the day, switch off the machine by turning the
ON/OFF switch (
14
) to the "0" position and close the gas tap
(
19
) by turning it to the "0" position.
“Before using the machine make sure that:
the main electricity supply ON/OFF switch is ON;
the water supply and water softener taps are open.”
Turn the main switch (
14
) to position 1. The “machine ON”
indicator light (
4
) lights up.
If the water level in the boiler is below the minimum level, the
automatic level indicator light (
5
) lights up, and the boiler is
filled up to the optimal level (indicator light
5
OFF).
Turn the main ON/OFF switch (
14
) to position 2.
“
Heating
” now begins.
At the end of the day, turn the machine OFF by turning the
main ON/OFF switch (
14
) to position 0.
7. Setting at work
USE
31
Содержание M39 Classic
Страница 2: ......
Страница 3: ...I ...
Страница 6: ...4 ...
Страница 7: ...M39 C 18 1 11 11 2 3 6 20 8 9 12 14 15 19 21 22 17 18 23 36 7 4 5 9 5 ...
Страница 9: ...7 ...
Страница 26: ...24 Italiano Italiano ...
Страница 42: ...40 English English ...
Страница 58: ...56 Français Français ...
Страница 74: ...72 Deutsch Deutsch ...
Страница 90: ...88 Español Español ...
Страница 106: ...104 Portugûes Portugûes ...
Страница 109: ......
Страница 111: ......