manualshive.com logo in svg
background image

ATTENTION

This procedure is to be done once a year prior to the heating

season.  Anytime the heater is moved from one job location

to the next, or after servicing the heater.

MATERIALS REQUIRED

(To be secured through local purchase)

Quantity

Description

1

High Pressure Gas Gauge capable of 

reading up to 35 PSIG

1

1/4 in. Tee

1

1/4 in. Nipple

A.  PREPARATION

1. Close fuel supply valve at LP gas supply container.

2. Allow heater to burn off gas remaining in it’s gas

supply line..

3. Close manual main burner valve on heater.

4. Remove gas hose from heater.

5. Remove hose adapter from inlet of pilot safety control

valve.

B.  GAUGE INSTALLATION

1. Connect the following materials together in the order

as given.  See Fig. 14.

-- Tee to inlet of pilot safety control.

-- Nipple to tee.

-- Hose adapter (as removed earlier) to nipple.

-- Gas hose to hose adapter.

2. Tighten all connections securely.

3. Connect gauge to tee.

C.  READING PRESSURES

1. Start the heater.  With the heater operating, the

pressure gauge should read the pressure specified

on the dataplate or in the specification section of this

owner’s manual.

2. Does the pressure reading at the inlet of the safety

control agree with that given on the dataplate?  If so,

no further checking or adjustment is required.

Proceed to section D.

3. If the inlet pressures do not agree with that specified

on the dataplate, then check the following:

-- Improper regulator for heater.

-- Blockage in gas hose.

-- Insufficient size or quantity of LP gas supply 

containers.

D.  COMPLETION

1. Once the proper inlet pressure has been confirmed,

close fuel supply valves.

2. Allow heater to burn off fuel remaining in gas supply

line.

3. Remove gauge, hose adapter, nipple and tee.

4. Reconnect hose adapter to inlet of safety control

valve and hose to hose adapter.

5. Tighten all connection securely and check for gas

leaks.

Gas Pressure Checks

WARNING

Do not disassemble the pilot safety control valve.

Do not attempt to replace any components of the pilot

safety control valve.

The pilot safety control must be replaced if any

physical damage occurs to it.

Failure to follow this warning will result in fire or

explosions, leading to injury or death, and building

damage.

13

HIGH PRESSURE GAUGE

HOSE

NIPPLE

TEE

PILOT 
CONTROL 
VALVE

HOSE ADAPTER
(FROM PILOT VALVE INLET)

FIG. 14

Use only a soft brush, dry rag, or compressed air to

clean the burner and pilot orifices.

Do not push instruments into burner or pilot orifice

holes.  Doing so may enlarge or distort the holes

creating improper combustion, pilot outages, or burner

flames extending beyond the heater case.

Ensure the pilot orifice screen is installed prior to orifice

assembly.  Its purpose is to trap contamination that

would prevent the pilot orifice from operating properly.

Do not use pliers to loosen or tighten heater

components.  Doing so may round off the component

creating service problems.  Always use the appropriate

wrench.

Содержание Twin Jet 400

Страница 1: ...e at 1 800 345 7200 Owner s Manual and Instructions Jet 200 and Twin Jet 400 Circulating Construction Heaters ATTENTION ALL USERS This heater has been tested and evaluated by L B White Co Inc as a dir...

Страница 2: ...mage personal injury or loss of life GENERAL HAZARD WARNING Failure to comply with the precautions and instructions provided with this heater can result in Death Serious bodily injury or burns Propert...

Страница 3: ...o qualified See page 6 for definition of the necessary qualifications Contact your local L B White distributor or the L B White Co Inc for assistance or if you have any questions about the use of the...

Страница 4: ...ort Combustion Net Weight lbs Shipping Weight lbs Electrical Supply Volts Hz Phase Amp Draw Dimensions Inches L x W x H Minimum Safe Distances From Nearest Combustible Materials STARTING CONTINUOUS OP...

Страница 5: ...can mask fuel gas odor The o odorant i in p propane LP g gas a and n natural g gas i is colorless a and t the i intensity o of i its o odor c can f fade u under some c circumstances If there is an und...

Страница 6: ...amage 8 The hose assembly shall be visually inspected on a daily basis after heater relocation and when the heater is in use If it is evident there is excessive abrasion or wear or if the hose is cut...

Страница 7: ...ections as necessary to stop the leak After all connections are checked and any leaks are stopped turn on the main burner Stand clear while the main burner ignites to prevent injury caused from hidden...

Страница 8: ...w how to shut off the gas supply to the building and also to the individual heater Contact your fuel gas supplier if you have any questions 14 Any defects found in performing any of the service or mai...

Страница 9: ...er casting See Fig 7 FIG 7 8 Thread the orifice with control assembly into the inlet of the burner casting so that the tip of the burner orifice is flush with the inside of the burner and so the contr...

Страница 10: ...s on the threaded connections 2 Assemble the components together according to the figure This view is to show general assembly of the components only 3 Tighten all connections securely 4 Check a all c...

Страница 11: ...et the thermostat on the control panel to a point above room temperature The main burner will light 1 Close the gas supply valve located on the LP gas supply container 2 Allow the heater to burn off a...

Страница 12: ...e heater a thorough cleaning At this time remove the fan and motor assembly and brush or blow off the fan blade assembly Additionally make sure the burner air inlet venturi ports and the casting are f...

Страница 13: ...then check the following Improper regulator for heater Blockage in gas hose Insufficient size or quantity of LP gas supply containers D COMPLETION 1 Once the proper inlet pressure has been confirmed...

Страница 14: ...NAL WIRES AS SUPPLIED WITH THE HEATER MUST BE REPLACED IT MUST BE REPLACED WITH WIRING MATERIAL HAVING A TEMPERATURE RATING OF AT LEAST 302 F 150 C ELECTRICAL CONNECTION DIAGRAM MOTOR RED GAS CONTROL...

Страница 15: ...lean orifice or screen with compressed plugged air replace pilot orifice or screen if necessary Defective pilot control valve Replace pilot control valve Debris plugging up pilot screen Replace pilot...

Страница 16: ...nameplate on heater for correct gas pressure 8 Gas solenoid valve chatters Defective solenoid in gas valve Replace solenoid valve Models 326 and 330 Gas pressure too high Check dataplate on heater fo...

Страница 17: ...o shut off the flow of gas to the main burner when the pilot flame is extinguished or becomes too small to light the main burner Pilot Tube Formed copper tube used to convey gas from the safety contro...

Страница 18: ...18 1 2 3 4 5 7 6 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 21 23 24 25 26 27 28 29 30 31 32 33 34 35 PARTS IDENTIFICATION PARTS SCHEMATIC...

Страница 19: ...90 N A 120 02990 17 Wheel 130 01099 18 Elbow N A 130 01300 N A 130 01300 19 Nipple N A 130 01142 N A 130 01142 20 Valve 130 20229 21 Connector N A 130 04648 N A 130 04648 22 Tube w Nuts N A 500 20406...

Страница 20: ...of p purchase b by the e end u user Warranty is automatic if a component is found defective within 12 months of the date code marked on the part If the defect occurs more than 12 months later than th...

Отзывы: