Rigging procedures
Stacking a Kara standalone array
Using M-BUMP
Modeling and safety
A Kara array must be stacked onto an M-BUMP/M-BAR/M-JACK platform (platform stacked array). The platform provides
tilt adjustments in case of slope surface and increases the array stability.
Any platform stacked array must be modeled before installation so as to ensure acoustical conformity. This can be done
using L-Acoustics
which will assist the user to:
• Determine the number of required Kara enclosures.
• Calculate the inter-enclosure angles.
A platform stacked array can be composed of a maximum of 9 Kara enclosures along with all loudspeakers
cables (refer to
(p.26)).
The platform must be installed in rear extension conguration if the Kara array is intended to have a positive site
Stacking platform conguration
(p.195)).
The platform must be installed in front extension conguration if the Kara array is intended to have a negative site
Stacking platform conguration
(p.195)) and a at shape (all inter-enclosure angles are close to
0°).
The Kara and M-BUMP fully integrated rigging systems allow assembling the array with no need for any external
accessory. The following rst procedure describes how to mount a vertical Kara platform stacked array. The second
procedure describes how to disassemble the array.
Array mounting
About this task
All along the procedure:
Strictly follow the sequence of the successive steps.
Systematically verify that each BLP is fully inserted.
Systematically verify that each bolt is fully screwed in and secured with pin.
For clarity purposes the loudspeaker cabling procedure will not be described.
The loudspeaker cables will not be represented on the gures.
Procedure
1.
Place an M-BUMP at the rigging location. Turn it so that the text of the identication plate is upside down and the
laser slits are directed towards the audience.
2.
Mount two M-BAR/M-JACK assemblies as follows (repeat for each M-BAR):
a) Remove the safety pin (see
Safety pin removal and insertion
(p.199)) and the bolt from a shackle.
b) Place an M-JACK under one end of an M-BAR and align the M-JACK hole with the second M-BAR hole.
c) Secure by inserting the preceding bolt and safety pin.
d) Repeat the procedure to attach a second M-JACK to the other end of the M-BAR.
90
Kara owner's manual (EN) version 1.0
Содержание LA-RAK
Страница 1: ...Kara owner s manual EN ...
Страница 5: ...APPENDIX D Safety pin removal and insertion 199 APPENDIX E Recommendation for speaker cables 200 5 ...
Страница 148: ...Corrective maintenance 5 Secure the handle 5 mm 5 N m 148 Kara owner s manual EN version 1 0 ...
Страница 179: ...Speci cations SB18 dimensions 750 mm 29 5 in 707 mm 27 8 in 553 mm 21 8 in Kara owner s manual EN version 1 0 179 ...
Страница 181: ...Speci cations SB28 dimensions 700 mm 27 6 in 1300 mm 51 2 in 550 mm 21 7 in Kara owner s manual EN version 1 0 181 ...
Страница 201: ...L Acoustics 13 rue Levacher Cintrat 91460 Marcoussis France 33 1 69 63 69 63 info l acoustics com www l acoustics com ...