Rigging procedures
Rigging a Kara IIi downll array under a K3i array with KARAIIi-DOWNK3i
Type of deployment
own array
Rigging accessory
KARAIIi-DOWNK3i
Screws and fasteners
4 M8x35 rigging screws (provided)
10 M6x19 rigging screws (provided)
Tools
electric screwdriver with torque selector
T40 Torx bit
T30 Torx bit
Min number of operators
3
Rigging plates
x2
K3i-LINK
Risk of falling objects
Verify that no unattached items remain on the product or assembly.
Additional safety for own arrays
When ying an array, use available holes to implement a secondary safety.
Procedure
1.
Prepare and raise an array of K3i. Refer to
Flying a K3i array with K3i-BUMP
(p.40).
2.
Prepare a single Kara IIi with KARAIIi-ENDLINK. Refer to the
Kara IIi owner's manual
.
3.
Assemble the three parts of KARAIIi-DOWNK3i with six M6x19 screws.
Do not fully tighten the screws.
T30
K3i owner's manual (EN) version 1.0
49