Rigging procedures
Final check
Visually check that no yellow labels are visible.
Manually check that all linking points are secured.
3.
Select the pickup point and raise the array.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
F
R
FRONT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
4.
Add additional enclosures under the array.
a) Lower the array onto a KS21 or a stack of KS21 on KS21-CHARIOT.
Align the runners and the tracks.
b) Connect the enclosures on both sides.
SHLAK!
c) Unlock the KS21-CHARIOT rigging arms.
74
A10 owner's manual (EN) version 1.1
Содержание A10
Страница 1: ...A10 owner s manual EN ...
Страница 38: ...Rigging system description 38 A10 owner s manual EN version 1 1 ...
Страница 121: ...Corrective maintenance If the speaker gasket is damaged remove and replace it A10 owner s manual EN version 1 1 121 ...
Страница 143: ...L Acoustics 13 rue Levacher Cintrat 91460 Marcoussis France 33 1 69 63 69 63 info l acoustics com www l acoustics com ...