2NP
1-5-20
1-5-9 Optical section
(1) Detaching and refitting the laser scanner unit
Procedures
1. Remove the cassette.
(See page 1-5-8)
2. Remove the rear cover and left lower
3. Remove two connectors.
4. Remove four screws and then remove
the laser scanner unit assy by pulling it
forwards.
5. Release the clamp and then remove the
FFC from the connector.
6. Remove two screws.
7. Remove the pin and spring and then
remove the unit holder Y.
8. Lift the laser scanner unit Y upwards
and then remove the laser scanner unit
Y (LSU-Y).
9. Similarly, remove the laser scanner unit
C/M/K(LSU-C/M/K).
10. Check or replace the laser scanner unit
and refit all the removed parts.
Figure 1-5-36
*: Wrap an antistatic discharging belt around your wrist to prevent damage to the LSU. Do not touch termi-
nals and FFC contacts in the APC PWB of the LSU.
*: When reconnecting FFCs, be sure to
insert the FFC all the way in with the
FFC connector.This is to avoid a
lengthy servicing due to a possible error
which could cause re-disassembly and
-assembly.
11. When replacing the new LSU, proceed
as follows:
1)When replacing the LSU-K,check and
adjust the assembly frame of LSU
unit. (see page 1-5-21).
When replacing the other LSU (LSU-
Y/C/M),proceed to next step 2.
2)Performs maintenance mode U469
(Auto color registration correction)
(see page 1-3-153).
3)Performs maintenance mode U464
(Calibration) (see page 1-3-148).
4)Performs maintenance mode U410
(Adjusting the halftone automatically)
(see page 1-3-133).
Figure 1-5-37
Screw
Screw
Screw
Screw
Laser scanner
unit assembly
Connectors
Screws
Pin & spring
Clamp
FFC
LSU-Y
Unit holder Y
LSU-C
LSU-K
LSU-M
Содержание TASKalfa 2551ci
Страница 1: ...SERVICE MANUAL Published in September 2016 842NP11A 2NPSM06A Rev A TASKalfa 2551ci ...
Страница 10: ...This page is intentionally left blank ...
Страница 97: ...2NP 1 1 2 74 This page is intentionally left blank ...
Страница 259: ...2NP 1 3 162 U486 Details on the modes Figure 1 3 47 Item No Description ...
Страница 473: ...2NP 1 5 62 This page is intentionally left blank ...
Страница 496: ...2NP 2 1 21 Figure 2 1 25 Duplex conveying section block diagram EPWB DU_SW DU_CL_REM YC25 3 YC24 3 DUCL DUS ...
Страница 497: ...2NP 2 1 22 This page is intentionally left blank ...
Страница 544: ...2NP 2 3 37 2 3 5 IH PWB Figure 2 3 5 IH PWB silk screen diagram YC1 1 2 YC8 1 3 YC6 2 1 YC4 6 1 YC3 YC10 YC9 ...
Страница 555: ...2NP 2 3 48 This page is intentionally left blank ...
Страница 584: ...Installation Guide DP 770 B Document processor DP 772 Document processor Installation Guide ...
Страница 620: ...DP 773 Document processor Installation Guide ...
Страница 646: ...PF 791 500 x 2 Paper feeder Installation Guide ...
Страница 654: ...PF 810 3000 sheets deck Installation Guide ...
Страница 667: ...DF 770 D Document finisher Installation Guide ...
Страница 685: ...AK 740 Bridge unit Installation Guide ...
Страница 687: ...PH 7A C D Punch unit Installation Guide ...
Страница 708: ...DT 730 B Document tray Installation Guide ...
Страница 710: ...5 2013 5 302LC56750 01 H F G D D 6 4 3 7 E C D D M4 8 M4 8 M4 8 M4 8 ...
Страница 711: ...FAX System W B Installation Guide ...