2RG/2RH
2-4-18
(6) System Error (Fxxxx) Outline
The document is described for the outline of the factors of the Fxxx errors that are not described in the self-diagnosis error code list.
Please utilize it as the measures when the system is not recovered after power off/on or it frequently occurs.
*: Please initially check the following when the error (Fxxx) is indicated.
- Check the DIMM (DDR memory) and neighboring parts: Check the contact on the control PWB by releasing and reinserting the DIMM.
If the error repeats after that, replace the DIMM.
Number
Contents
Verification procedure & check point
Remarks
Content
-
It locks on a Welcome screen.
(Even if time passes for a definite period of time
in more than * notes, a screen does not
change)
1. Check the harness of the connection state of a connector between Panel<=>Main boards,
and perform an operation check.
2. Initialize HDD and perform an operation check.
(FULL of U024) *
3. U021 Controller backup initialization is carried out and an operation check is performed.
4. Exchange a PanelMain board and perform an operation check.
5. Exchange a Main board and perform an operation check.
6. It will get, if USBLOG is obtainable, and contact service headquarters.
* : only HDD standard model
* Execution of U024 will vanish user data
and the software installed.
Reinstallation is required.
[Main <=> Panel]
Main PWB?YC12
Panel PWB?YC5
-
It locks on a starting logo (Taskalfa/Ecosys)
screen.
(Even if time passes for a definite period of time
in more than * notes, a screen does not
change)
1. Check the mounting failure of optional equipment and perform an operation check.
2. Check the harness of the connection state of a connector between Engine<=>Main
boards, and perform an operation check.
3. Check the harness of the connection state of a connector between Panel<=>Main boards,
and perform an operation check.
4. Initialize HDD and perform an operation check.
(FULL of U024) *
5. U021 Controller backup initialization is carried out and an operation check is performed.
6. Exchange a Engine board and perform an operation check.
7. Exchange a PanelMain board and perform an operation check.
8. Exchange a Main board and perform an operation check.
9. It will get, if USBLOG is obtainable, and contact service headquarters.
* : only HDD standard model
* Execution of U024 will vanish user data
and the software installed.
Reinstallation is required.
[Main <=> Engine]
Main PWB: YC63
Engine PWB: YC35
[Main <=> DP I/F PWB]
[Main <=> Panel]
Main PWB: YC12
Panel PWB: YC5
F000
CF000 will be displayed if * notes progress is
carried out for a definite period of time with a
Welcome screen.
The communication fault between Panel-Main
boards
Communication fault between Panel Core-Main
Core Notes 2
1. Check the harness of * (between Main board <=>HDD), and the connection state of a con-
nector between Panel<=>Main boards, and perform an operation check.
2. Check contact of a DDR memory (extracting) and perform an operation check.
If exchangeable, it will exchange and will perform an operation check.
3. Initialize HDD and perform an operation check.
(FULL of U024) *
4. U021 Controller backup initialization is carried out and an operation check is performed.
5. Exchange a Main board and perform an operation check.
6. Exchange a PanelMain board and perform an operation check.
7. It will get, if USBLOG is obtainable, and contact service headquarters.
* : only HDD standard model
* Note 2 : Only Dual Core CPU model
[Main <=> Panel]
Main PWB: YC12
Panel PWB: YC5
F12X
Abnormality detecting in a Scan control section
1. Check the harness between Engine/DP<=>Main boards, and the connection state of a
connector, and perform an operation check.
2. Initialize HDD and perform an operation check.
(FULL of U024) *
3. U021 Controller backup initialization is carried out and an operation check is performed.
4. Exchange a DP I/F, Engine and SHD board and perform an operation check.
5. Exchange a Main board and perform an operation check.
6. Get USBLOG and contact service headquarters.
* Only HDD standard model
[Main <=> Engine]
Main PWB: YC64
Engine PWB: YC37
[Main <=> DP I/F PWB
[DP I/F <=> SHD]
DP I/F PWB: YC2
SHD PWB: YC3
Содержание Copystar CS 3011i
Страница 1: ...SERVICE MANUAL Published in September 2016 2RHSM 1 Rev 1 6 3011i 6 3511i ...
Страница 4: ...This page is intentionally left blank ...
Страница 10: ...This page is intentionally left blank ...
Страница 78: ...2RG 2RH 1 2 51 B B A A B B A A B B A A Tray lower cover Pin Pin ...
Страница 79: ...2RG 2RH 1 2 52 11 Attach the tray lower cover 12 Fix the tray lower cover by using two pins Figure 1 2 77 ...
Страница 83: ...2RG 2RH 1 2 56 This page is intentionally left blank ...
Страница 496: ...2RG 2RH 2 1 18 Figure 2 1 23 Duplex conveying section block diagram EPWB DU_SENS DU_CL_REM YC13 A5 YC15 1 DUCL DUS ...
Страница 504: ...2RG 2RH 2 2 8 This page is intentionally left blank ...
Страница 568: ...Installation Guide DP 7100 Document processor Installation Guide ...
Страница 572: ...2 1mm 0mm ն ո պ ջ չ շ A D C B B A ...
Страница 573: ...3 ռ ս վ ր ւ ց տ E A ...
Страница 574: ...4 ք द I M3x8 փ F G M4x10 K J H A ...
Страница 575: ...5 ON ध A ...
Страница 577: ...7 շ յ ն ո D E B ...
Страница 578: ...8 չ պ F G M4x10 H I M3x8 K J ջ B ...
Страница 579: ...9 ռ B ...
Страница 589: ...19 ո ն շ պ ջ չ 8 6 7 10 11 9 A B ...
Страница 599: ...DP 7110 Document processor Installation Guide ...
Страница 603: ...2 շ շ 2 շ 2 շ C M4x14 E ߑ ߒ ߓ ߔ ո շ 2 ߑ ն A ...
Страница 604: ...3 ߘ ո ߕ ߗ ո չ պ ջ ߖ F G H M3x8 BLACK A ...
Страница 605: ...4 ռ վ ր ւ ց ࠉտ ս I A ...
Страница 606: ...5 J L փ ք द K M3x8 K M3x8 K M3x8 ध A ...
Страница 607: ...6 ऩ प भ फ ब न म O N A ...
Страница 608: ...7 ON य A ...
Страница 610: ...9 շ ո շ 2 շ 2 շ 2 ߑ ն շ ߑ ߒ ߓ ߔ C M4x14 E B ...
Страница 611: ...10 ߖ ߕ ߘ ߎ չ պ ջ ߗ F G ո H M3x8 BLACK B ...
Страница 612: ...11 ռ ս տ ր ց վ I B ...
Страница 613: ...12 ւ ք द ध न փ J L P K M3x8 K M3x8 B ...
Страница 614: ...13 ऩ प फ O N B ...
Страница 634: ...DP 7120 Document processor Installation Guide ...
Страница 638: ...2 1mm 0mm ն շ ո չ ջ պ B B A D C A ...
Страница 639: ...3 ռ ս վ տ ց ր E A ...
Страница 640: ...4 G ւ F F ք փ H ON 10 mm 10 mm A ...
Страница 642: ...6 շ ո յ ն D B ...
Страница 643: ...7 չ E B ...
Страница 644: ...8 F ON G պ F ջ ռ H 10 mm 10 mm B ...
Страница 653: ...17 ղ ն շ ճ մ յ 2 6 7 3 4 5 A B ...
Страница 655: ...19 չ ջ պ ս վ ռ 9 11 10 13 14 12 10 mm A B ...
Страница 665: ...PF 791 500 x 2 Paper feeder Installation Guide ...
Страница 673: ...PF 810 3000 sheet deck Installation Guide ...
Страница 686: ...DF 791 3000 sheet finisher Installation Guide ...
Страница 701: ...DF 7120 1000 sheet finisher Installation Guide ...
Страница 705: ...2 մ յ ն 7 7 15 a b a a b b b a A ...
Страница 706: ...3 ո շ չ պ A ...
Страница 707: ...4 ջ ռ ս c d 14 c d c d 12 c d ջ ռ ս c d 14 c d c d 12 c d A ...
Страница 708: ...5 վ ր D ց ON տ A ...
Страница 710: ...7 L յ մ ն շ B ...
Страница 712: ...9 ս ռ վ տ G B ...
Страница 713: ...10 ր ց ւ b a 17 17 25 a b a a b b B ...
Страница 714: ...11 ք փ द c d 24 c d c d 22 c d B ...
Страница 715: ...12 न ध ऩ प B ...
Страница 716: ...13 ब फ ON D B ...
Страница 719: ...AK 740 Bridge unit Installation Guide ...
Страница 721: ...MT 730 Mailbox Installation Guide ...
Страница 736: ...PH 7A C D Punch unit Installation Guide ...
Страница 757: ...DT 730 B Document tray Installation Guide ...
Страница 759: ...5 2013 5 302LC56750 01 H F G D D 6 4 3 7 E C D D M4 8 M4 8 M4 8 M4 8 ...
Страница 760: ...FAX System 12 Installation Guide ...