6-14
Machine transportation after setup > Procedure for the main unit transportation (Truck transportation)
[CONFIDENTIAL]
6 - 2 Procedure for the main unit transportation (Truck transportation)
In case that the main unit is transported by the truck, follow the procedure bellow.
In case of transporting the main unit to the outside of the building, please be careful of giving the main unit
vibration during transportation.
Please try to avoid moving the main unit after the installation if possible since there might be the possibility to
occur the failure of the main unit due to the ink leakage by inclining more than 20 degrees.
(1)Before transportation
1
Enter maintenance mode.
2
Select [Cleaning] in U744 Head Cleaning and select [Normal] for each color then
press [Execute]/[Start] to run purge.
3
Set the maximum sized paper such as over A3/Ledger paper.
4
Select [Check] in U744 <Head cleaning> and the test chart is output automatically.
5
Place the test chart on the scan table and scan it.
CAUTION
The following procedure is for reference only and is not covered by the warranty.
IMPORTANT
Wear rubber gloves in handling. (If the liquid get your hands, rinse it immediately with water.)
IMPORTANT
The machine can be operated by the ink temperature of over 26 °C.
Once it is executed, it is not possible to cancel the operation.
In case of displayed temperature is below 26 °C, select the priority mode to "Printing" in U735 <Ink temperature
control setting>.
Содержание AK-9110
Страница 9: ...This page is intentionally left blank ...