2-6
The main unit setup procedure > Unpacking
[CONFIDENTIAL]
2 - 1 Unpacking
(1) Main unit packing
1 Skid
2 Hinge
3 Bottom pad
4 Lower pad
5 Accessory case
6 Outer case
7 Main unit
8 Main unit cover
9 Operation pad
10 Upper pad
11 Waste ink tank
12 Right exit tray
13 Holder case
14 Empty case
15 Cleaning liquid tank
16 Top case
IMPORTANT
Do not lift up and move the main unit by holding handles only.
The handles are just used for changing the direction or cross over a small gap.
Содержание AK-9110
Страница 9: ...This page is intentionally left blank ...