Operating Data
Ideal operating pressure

  : 3 bar (45 PSI)

Max. operating pressure

  : 5 bar (70 PSI)

Ideal water temperature

  : 20°C  (68°F)

Max. water temperature

  : 60°C  (140°F)

Operation
Pot fillers are designed for the delivery of 
cold  tap  water  and  may  be  positioned 
above basins or stoves. The  dual swivel 
spout 

enables 

the 

outlet 

to 

be            

conveniently positioned above pots/pans 
as required.
For ease of use, the pot filler is fitted with 
2  control  valves.  If the pot filler is to be 
left  unattended,  ensure  both  valves 
are in the closed position.

Installation

Note: When installing on plasterboard walls 
(not  solid  walls)  an  appropriate  reinforce-
ment  must  be  in  place  to  ensure  sufficient 
strength. 

KWC  1922  Pot  Filler  should  be  connected  to  
a 1/2” male NPT connector.

Arrange  the  in-wall  plumbing  so  that  the  pot 
filler  is  positioned  at  an  appropriate  height  for 
your particular installation. 

The  adjustable    flange    allows  for  correct  installation  without  the  need  for    precise 
positioning of the internal pipe work. Therefore, the NPT connector should protrude 
from the wall / tile face 0 - 1/2”. 

Plaster (and tile) around the 1/2” NPT connector so that the flange (D) will cover the 
rough  area.  Ensure  room  is  left  for  the  valve  body  (E)  to  pass  through  onto  the    
connector and enough space is left for attachment with the screws (C) and anchors.

Thread the pot filler onto the plumbing connection with the flange back plate (B) over 
the  valve  body  (E).  Without  fully  tightening,  position  and  level  (spirit  level  recom-
mended) the pot filler horizontally, slide the flange back plate (B) up against the wall, 
and tighten onto the valve body (E) with the set screw (F). Mark the position of the 
holes, and remove the pot filler.

Drill the 4 holes as marked, and attach the flange back plate (B) and seal (A) to the 
wall with the screws (C) provided. 

Fit the flange cover (D) over the valve body (E) and attach to the connector ensuring 
seal. (PTFE tape may be required). The pot filler must be tightened so that it finishes 
in a horizontal position and again is fastened in place with the set screw (F).

Slide flange cover (D) over the back plate (B) and fix in place with the set screw (G).