KVH Industries tracvision M7SK Скачать руководство пользователя страница 8

8

Follow the steps below to mount the antenna.

a.

Remove the six #10-32 Phillips screws 

securing the radome to the baseplate (see 

Figure 12). Carefully lift the radome straight 

up until clear of the antenna assembly and set 

it aside in a safe place. If you keep the radome 

topside, secure it with a lanyard to prevent it 

from falling overboard. Also, do not place the 

radome on a hot steel deck – the heat may 

warp the radome.

b.

Keeping shipping restraints in place, 

transport the antenna to the mounting 

location.

NOTE: 

The two hoisting eyelets on the antenna frame 

may be used to lift the antenna, if necessary (see 
Figure 13). After
 they have been used once, make sure 
they are undamaged and free of cracks before using 
them again.

c.

Place the antenna baseplate over the holes 

drilled in the mounting surface. 

d.

Ensure the forward arrow inside the 

baseplate points toward the bow and is 

parallel to the vessel’s centerline (see 

Figure 14).

 

CAUTION

Observe the safety warnings printed on the 

tube of Loctite

®

 anti-seize lubricant: 

“Contains mineral oil, calcium hydroxide, 

and copper. May cause skin, eye, and 

respiratory irritation. Wear eye protection 

and gloves. 

First aid: 

In case of eye or skin 

contact, flush with water. Obtain medical 

attention for any eye or internal contact.” 

  #10-32 

S

crew (x6)

Figure 12:  Removing the Radome

Hoisting Eyelets (x2)

Figure 13:  Hoisting Eyelets

FOR

W

ARD

Figure 14:  Forward Arrow in Antenna Baseplate

Mount the Antenna

6

Содержание tracvision M7SK

Страница 1: ...Installation Guide TracVision M7SK Switchplate Configuration Tapered Baseplate Version...

Страница 2: ...to install the system To find a technician near you visit www kvh com wheretogetservice Linear vs Circular Systems The installation process differs slightly depending on the type of LNB low noise bloc...

Страница 3: ...with Snap N Seal F connectors see page 7 Augat IT1000 connector installation tool Switchplate power cable not supplied see Figure 2 and page 13 Silicone sealant self vulcanizing tape or equivalent Sa...

Страница 4: ...on of the vessel s fore and aft centerline and midships Do not mount the antenna at the same level as the radar because the radar s energy might overload the antenna Ideally you should mount the anten...

Страница 5: ...ground Prepare the Switchplate Mounting Site Once you have identified a suitable switchplate mounting site follow these steps to prepare the site for installation NOTE If you prefer you may install t...

Страница 6: ...ou marked in Step b Later you will insert four 1 2 13 bolts through these holes to secure the antenna to the mounting surface d Cut out the 3 75 95 mm cable access hole in the location you marked in S...

Страница 7: ...onnect the RF coax cable s to the antenna If you need to connect just one RF cable connect the cable to the RF1 connector on the bottom of the antenna Hand tighten then tighten with a 7 16 wrench for...

Страница 8: ...After they have been used once make sure they are undamaged and free of cracks before using them again c Place the antenna baseplate over the holes drilled in the mounting surface d Ensure the forwar...

Страница 9: ...eplate are bottomed against the mounting surface and the foam seal is fully compressed KVH recommends that you tighten the bolts to between 34 and 40 ft lbs 46 1 and 54 2 N m of torque Be sure your 1...

Страница 10: ...t brackets for future use c In place of the brackets place a 3 8 flat washer supplied in the kitpack on each of the two 3 8 bolts that you just removed Then reinstall the bolts and secure them in plac...

Страница 11: ...rews to secure all wires in place c Connect the power cable from the antenna to the switchplate s power output terminals see Figure 19 Figure 18 Switchplate Wiring Antenna Data Cable Brown White White...

Страница 12: ...In connector on the fourth receiver NOTE If you need to connect more than four receivers to the TracVision system install an active multiswitch that generates a 22 KHz tone such as Spaun model SMS 560...

Страница 13: ...erminal connectors from the back of the switchplate and crimp them onto the power cable s wires d Connect the power cable wires to the power and ground input terminals on the switchplate see Figure 21...

Страница 14: ...panel If you chose this option simply use two of the 6 screws to mount the switchplate to the panel a Align the four mounting holes in the switchplate with the holes in the mounting surface see Figur...

Страница 15: ...kin models 64 bit Windows Vista 7 users should use Belkin F5U257 b Open Windows HyperTerminal and establish the following settings for your COM port see Figure 24 Bits per second 9600 Data bits 8 Pari...

Страница 16: ...es Refer to the associated Application Note on the KVH Partner Portal KVH authorized technicians only d Type ZAP then press Enter The antenna restarts Wait one minute for system startup e Set up the r...

Страница 17: ...radome can affect reception The vessel must be located within the selected satellite s coverage area to receive its satellite TV signals To view satellite coverage maps visit www kvh com footprint Pl...

Страница 18: ...CTV 110 W DSS_110 DIRECTV 119 W DSS_119 EchoStar 61 W ECHO_61 EchoStar 110 W ECHO_110 EchoStar 119 W ECHO_119 EchoStar Ciel 2 129 W ECHO_129 Bell TV 82 W EXPRESSVU Bell TV 91 W EXPRESSTV Satellite Lon...

Страница 19: ...IN AUDIO VIDEO S VIDEO PHONE JACK R L Fourth Receiver Optional Satellite In RF4 Optional SATELLITE IN OUT TO TV TV ANT CABLE IN AUDIO VIDEO S VIDEO PHONE JACK R L Third Receiver Optional Satellite In...

Страница 20: ...20 Switchplate Mounting Template C 3 82 97 mm 32 8 mm 2 36 60 mm 16 4 mm 3 19 81 mm 2 05 52 mm Panel Cutout 3 32 2 25 mm...

Страница 21: ...847 3327 Fax 1 401 849 0045 E mail info kvh com KVH Industries A S EMEA Headquarters Kokkedal Denmark Tel 45 45 160 180 Fax 45 45 160 181 E mail info emea kvh com KVH Industries Pte Ltd Asia Pacific H...

Отзывы: