Final operations
39
Final operations
Trial run
Referring to the operating manual, adjust the machine and carry
out a trial run.
Check the following after the assembly process.
•
Length of PTO shaft. See »PTO shaft length«, page 27.
•
All bolts and torques.
•
Correct routing of the hydraulic tubes and electrical cables.
•
Hydraulic connections (based on the components).
Extend the hydraulic cylinders to and retract them from the end
position at least 10 times in order to bleed the cylinders.
Once complete, check the hydraulic system for leakages.
Environment
•
Dispose of packaging according to the current local waste disposal
guidelines.
•
Ensure that lubricants are handled and disposed of correctly.
No persons within the slewing range
There is an extreme risk of injury within the slewing range from
slewing or folding machine parts.