Delivery and assembly
13
Procedure
Turn the hopper so that the hoses come out from the rear of the
machine.
Using U clamps, fix the support to the second beam of the main
frame.
Use the four long fixing screws.
Insert the 14 screws (B) in the tubes to fix the hopper.
Mounting diagrams for the
platform and hopper support
A
B
CLC 2 rows 3m00 (
9’10”
)
CLC 2 rows 3m50 (
11’6”
)
345 mm
13
9/16
”
140 mm
5
1/2
”
345 mm
13
9/16
”
A
B
A
Platform
B
Hopper support
Содержание a-drill
Страница 80: ...Seed drill adjustment 80 Sowing tables ...
Страница 81: ...Seed drill adjustment 81 ...
Страница 82: ...Seed drill adjustment 82 ...
Страница 83: ...Seed drill adjustment 83 ...
Страница 84: ...Seed drill adjustment 84 ...
Страница 85: ...Seed drill adjustment 85 ...
Страница 89: ...Filling the seedbox 89 Qualidisc and Qualidisc Farmer Unfold the machine Fill in the seedbox ...
Страница 95: ...Adjustments 95 Main display Organisation of the menus ...