12,000 Cycle Maintenance Steps
5-9
KVAL MLX Operation/Service Manual
12,000 Cycle Maintenance Steps
Follow Lockout Tagout procedures.
Inspect Air Cylinders
Inspect all air cylinders for air leaks. Replace the cylinder if seal is leaking. Symptoms include a
cylinder not extracting or retracting to the limits. Cylinders not holding their position.
Inspect Ball Rail Shafts and Ball Screws
Inspect ball rail shafts for pitting or abrasions.
]
Inspect ball screws for pitting or abrasions.
Clean and Lubricate Slides, Cylinder Rods and Bearing Shafts
Clean and lubricate all slides and cylinder rods with dry silicone spray.
Example of a Pitted Ball Rail
Example of a Pitted Ball Screw
Содержание MLX
Страница 29: ...How to Download the Service Application 1 19 KVAL MLX Operation Service Manual Page Intentionally Left Blank ...
Страница 59: ...About the Tool Config Tabs 2 29 KVAL MLX Operation Service Manual ...
Страница 64: ...Description of the Light Tower KVAL MLX Operation Service Manual 2 34 ...
Страница 79: ...Step 2 Calibrate the Carriage Axis KVAL Operation Manual 3 15 FIGURE 3 3 Face Cut X Y Z X Y Z Y ...
Страница 90: ...System IT Administration KVAL MLX Operation Service Manual 4 4 ...
Страница 117: ...Collet Torque Values 5 27 KVAL MLX Operation Service Manual ...
Страница 118: ...Collet Torque Values KVAL MLX Operation Service Manual 5 28 ...
Страница 141: ......
Страница 142: ......
Страница 143: ......