Initial Powering Operations for the Edge-SS
KVAL Operation Manual
3-6
Initial Powering Operations for the Edge-SS
This section describes how to power up and to power down the Edge-SS.
Powering up the system includes:
• Applying power to the entire system
• Starting the Control Circuit
Powering down the system includes:
• Shutting down the control power
• Removing power from the entire system
How to Power Up the Vision Line
1.
Ensure factory air is applied to each machine and main air supply is turned on.
2.
Check that all E-Stop buttons are out and safety gates are closed.
Note:
A pop-up is displayed on the user screen if an E-Stop is pressed. The pop-up
will indicate which E-Stop has been activated
3.
Make sure the electrical disconnect each electrical
cabinet is turned to the ON position.
4.
Switch the green
CONTROL CIRCUIT
switches to the ON posi-
tions. They should light up.
5.
Push the green
START MACHINE
buttons to “boot up” the
machines.
Note:
Boot up may take 2 to 3 minutes.
6.
When the machine is ready to operate, all status lights on the
signal tower should be green.
Содержание Edge-SS
Страница 4: ...KVAL Edge SS System Operation Manual ...
Страница 6: ...KVAL Edge SS System Operation Manual ...
Страница 12: ...KVAL Edge SS Manual Table of Contents ...
Страница 32: ...How to Download the Service Application KVAL Operation Manual 1 20 Page Intentionally Left Blank ...
Страница 49: ...About Revisions 2 16 KVAL Manual ...
Страница 84: ...Common Terms 2 51 KVAL Manual FIGURE 2 11 Example of a Validation Report ...
Страница 147: ...About the Nodes 5 21 KVAL Operation Manual ...
Страница 149: ...Index Kval Edge SS clean up 12 inspect 12 ...
Страница 150: ......
Страница 151: ......