Summary of Machining a Door
3-5
Commander III Operation Manual
Set-Up Front Section and Machine the Door
After
Door Job
is loaded, select the
Commander3 Button
The H-Block and Jamb Stop locations are compared to the
last Door Job that was processed.
The KvalCAM program will highlight any H-Blocks to be moved (Orange back-
ground with an
” X” H-Block Found
field).
In case of Left-Hand Doors, the Jamb Stop location will be listed as well.
5.
If needed, move the H-Block (
Left edge of block as reference
)
6. Left Hand Doors:
If needed, move
Jamb Stop
to the displayed position. (left
edge of block as reference)
7.
If the current group cut is completed, the next
group
will automatically load.
8.
If needed, move the highlighted H-Block.
9.
If all groups are finished and the
Door Finished
Button is active, the door will
feed out
10.
If needed, move the highlighted the H-Block.
11.
After all groups are completed, the door will feed out of the machine
Содержание Commander III
Страница 29: ...How to Download the Service Application 1 19 KVAL Commander III Operation Manual Page Intentionally Left Blank ...
Страница 46: ...About Revisions 2 16 KVAL Manual ...
Страница 81: ...Common Terms 2 51 KVAL Manual FIGURE 2 11 Example of a Validation Report ...
Страница 162: ...Options KVAL Commander III Operation Manual 5 20 ...
Страница 165: ......
Страница 166: ......
Страница 167: ......