![Kval 994-X Скачать руководство пользователя страница 35](http://html.mh-extra.com/html/kval/994-x/994-x_operation-manual_2012818035.webp)
Powering Operations for the 994-X
2-5
KVAL 994-X Operation Manual
Powering Operations for the 994-X
This section describes how to power up and power down the
994-X
.
Powering up the system includes:
• Applying power to the entire system.
• Starting the Control Circuit.
Powering down the system includes:
• Shutting down the control power.
• Removing power from the entire system.
How to Power Up the 994-X
1.
Ensure that factory air is applied to machine and main air supply is turned on.
2.
Check that all E-Stop buttons are out and safety gate doors are closed.
Note:
A pop-up is displayed on the user screen if an E-Stop is pressed. The pop-up
will indicate which E-Stop has been activated.
3.
Make sure the electrical disconnect in the electrical cabinet is turned to the ON posi
-
tion.
4.
Switch the green
Control Circuit
switch to the ON position. It should light up.
5.
Push the green
Start Machine
button to ‘boot up’ the machine.
Note:
Boot up may take 2 to 3 minutes.
Control Circuit
Start
Note:
Some control panels may have a different orientation of
the buttons.
6.
All lights on the status light panel on the electrical
box should be illuminated.
Note:
If a status light does not turn on during the
power up process, see the
994-X Service Manual
for assistance in identifying the issue.
Содержание 994-X
Страница 4: ...KVAL 994 X Operation Manual ...
Страница 29: ...How to Download the Service Application 1 21 KVAL 994 X Operation Manual Page Intentionally Left Blank ...
Страница 82: ...Calibration of the Back Section KVAL 994 X Operation Manual 3 22 ...
Страница 124: ...KVAL 994 X Operation Manual 4 42 ...
Страница 128: ...Index Kval 994 X ...
Страница 129: ......