Replacing Tooling in the Back Section
3-38
990-HQ Service Manual
Changing the Bore Drill
Caution:
Turn off all power to the machine. Follow proper lockout/tagout procedures
as detailed in the safety section of Chapter 1 of this manual.
1.
Remove Dust Collection Guard
2.
Use the shaft wrench and collet
wrench to remove the bit on the
pre-drill or router assemblies. See
photo.
When loosening the collet, it may
tighten up, crack again and con-
tinue.
3.
Inspect and clean collet assembly.
4.
Insert the new bit into the assem-
bly.
5.
Before tightening the collet assembly, adjust the bit depth. Bottom out the bit and
pull the bit up about 1.4''.
6.
Lightly tighten and torque to correct value. For torque values,
Note:
Make sure the arbor is not bottomed out in the back of the motor. If it is, the
arbor will not tighten and will damage the collet or other machine parts.
Note:
The figure shows the cover off for training purposes.
Collet Wrench (PN:
15-00-ER32)
Shaft Wrench (1-5/8 '')
(PN: WRENCH026)
Содержание 990-HQ
Страница 4: ...KVAL 990 HQ Service Manual ...
Страница 9: ...Notes ...
Страница 27: ...How to Download the Service Application 1 18 990 HQ Service Manual Page Intentionally Left Blank ...
Страница 29: ...Safety Sign Off Sheet 1 20 990 HQ Service Manual ...
Страница 38: ...Network System Overview 2 9 990 HQ Service Manual ...
Страница 65: ...Lubrication Points on the 990 HQ 3 27 990 HQ Service Manual FIGURE 3 18 Bearings Back Section ...
Страница 79: ...Collet Torque Values 3 41 990 HQ Service Manual ...
Страница 80: ...Appendix Conversion Chart 3 42 990 HQ Service Manual Appendix Conversion Chart ...
Страница 81: ...Appendix Conversion Chart 3 43 990 HQ Service Manual ...
Страница 108: ...Troubleshooting with the Status Light Panel 4 27 990 HQ Service Manual ...
Страница 111: ......