22
3BA00133 • 2013-06-25 • Rev. 5
ersa IRHP 200
Transport, storage, mounting, disposal/Comissioning
4.4
Disposal
Comply with the waste disposal guidelines applicable in the country where the machine
is used.
5.
Comissioning
■
Remove heating plate and the temperature controller from the pack
-
aging and place them on your workstation.
■
Check whether the mains voltage matches
the value specified on the
name plate.
■
Connect the lines as shown in the following illustration.
heating plate
control station
Содержание IRHP 200
Страница 11: ...11 3BA00133 2013 06 25 Rev 5 ersa IRHP 200 Funktionsbeschreibung 6 4 Kennlinien...
Страница 16: ...16 3BA00133 2013 06 25 Rev 5 ersa IRHP 200 Notizen...
Страница 17: ...Ersa IRHP 200 Rework heating plate Operation Manual...
Страница 25: ...25 3BA00133 2013 06 25 Rev 5 ersa IRHP 200 Functional discription 6 4 Characteristic...
Страница 30: ...30 3BA00133 2013 06 25 Rev 5 ersa IRHP 200 Notes...
Страница 31: ...31 3BA00133 2013 06 25 Rev 5 ersa IRHP 200 Notes...