Modifications
After modifications to the industrial robot, checks must be carried out to
ensure the required safety level. The valid national or regional work safety
regulations must be observed for this check. The correct functioning of all
safety functions must also be tested.
New or modified programs must always be tested first in Manual Reduced
Velocity mode (T1).
After modifications to the industrial robot, existing programs must always
be tested first in Manual Reduced Velocity mode (T1). This applies to all
components of the industrial robot and includes e.g. modifications of the
external axes or to the software and configuration settings.
Faults
The following tasks must be carried out in the case of faults in the indus-
trial robot:
• Switch off the robot controller and secure it (e.g. with a padlock) to
prevent unauthorized persons from switching it on again.
• Indicate the fault by means of a label with a corresponding warning
(tagout).
• Keep a record of the faults.
• Eliminate the fault and carry out a function test.
3.5.2
Transportation
Manipulator
The prescribed transport position of the manipulator must be observed.
Transportation must be carried out in accordance with the operating in-
structions or assembly instructions of the robot.
Avoid vibrations and impacts during transportation in order to prevent
damage to the manipulator.
Robot controller
The prescribed transport position of the robot controller must be observed.
Transportation must be carried out in accordance with the operating in-
structions or assembly instructions of the robot controller.
Avoid vibrations and impacts during transportation in order to prevent
damage to the robot controller.
External axis (optional)
The prescribed transport position of the external axis (e.g. KUKA linear
unit, turn-tilt table, positioner) must be observed. Transportation must be
carried out in accordance with the operating instructions or assembly in-
structions of the external axis.
3.5.3
Start-up and recommissioning
Before starting up systems and devices for the first time, a check must be
carried out to ensure that the systems and devices are complete and op-
erational, that they can be operated safely and that any damage is detec-
ted.
The valid national or regional work safety regulations must be observed
for this check. The correct functioning of all safety circuits must also be
tested.
KR IONTEC
MA KR IONTEC V4 | Issued: 11.05.2021
www.kuka.com
| 27/344
Safety
Содержание IONTEC KR 20 R3100
Страница 14: ...KR IONTEC 14 344 www kuka com MA KR IONTEC V4 Issued 11 05 2021 Introduction...
Страница 166: ...KR IONTEC 166 344 www kuka com MA KR IONTEC V4 Issued 11 05 2021 Planning...
Страница 188: ...KR IONTEC 188 344 www kuka com MA KR IONTEC V4 Issued 11 05 2021 Start up and recommissioning...
Страница 300: ...Fig 9 58 Wiring diagram axis A2_KS A1 A3 KR IONTEC 300 344 www kuka com MA KR IONTEC V4 Issued 11 05 2021 Repair...
Страница 301: ...Fig 9 59 Wiring diagram axis A3_KS A1 A3 KR IONTEC MA KR IONTEC V4 Issued 11 05 2021 www kuka com 301 344 Repair...
Страница 302: ...Fig 9 60 Wiring diagram axis A4_KS A1 A3 KR IONTEC 302 344 www kuka com MA KR IONTEC V4 Issued 11 05 2021 Repair...
Страница 303: ...Fig 9 61 Wiring diagram axis A5_KS A1 A3 KR IONTEC MA KR IONTEC V4 Issued 11 05 2021 www kuka com 303 344 Repair...
Страница 304: ...Fig 9 62 Wiring diagram axis A6_KS A1 A3 KR IONTEC 304 344 www kuka com MA KR IONTEC V4 Issued 11 05 2021 Repair...
Страница 310: ...KR IONTEC 310 344 www kuka com MA KR IONTEC V4 Issued 11 05 2021 Repair...
Страница 318: ...KR IONTEC 318 344 www kuka com MA KR IONTEC V4 Issued 11 05 2021 Decommissioning storage and disposal...
Страница 340: ...KR IONTEC 340 344 www kuka com MA KR IONTEC V4 Issued 11 05 2021 KUKA Service...