Shredders
34
BKE 280-305 SUPER
Putting into service
2. Coupling the machine
Check that tractor PTO rotates clockwise.
- Lower the tractor three-point linkage.
- Place the lower links as close as possible under the
hitch pins.
- Attach the lower links to the hitch pins (1).
- Secure with lynch pins.
- Attach top link (2).
- Lock the upper hitch attachment using lynch pin (3).
- Lift the machine using the tractor's lift linkage.
Hydraulic connection
Connect hydraulic hoses (a) and (b) to the same
hydraulic double acting outlet.
The input machine rotation direction must
correspond to the tractor PTO rotation
direction.
Содержание BKE 280 SUPER
Страница 1: ...JN033AGB A OPERATOR S MANUAL Shredders BKE 280 305 SUPER JN033AGB A English 05 2010...
Страница 2: ......
Страница 26: ...Shredders 24 BKE 280 305 SUPER Safety Risk of entanglement 13 Stay clear of rotating drive line...
Страница 66: ...Shredders 64 BKE 280 305 SUPER Appendix T Axle loads Tractor only...
Страница 68: ...Shredders 66 BKE 280 305 SUPER Limited warranty Limited warranty...
Страница 69: ...Limited warranty Shredders BKE 280 305 SUPER 67...
Страница 70: ......
Страница 71: ......
Страница 72: ......