Spreading Operation
93
B
AXIS
20.1
AXIS
20.1
B.6.2
Running calibration test
Requirements:
The metering slides are closed.
PTO shaft and tractor engine are switched off and locked to prevent acciden-
tal starting.
Have a sufficiently large hopper ready for holding the fertiliser (holding capac-
ity at least
25 kg
). Determine the unladen weight of the bin.
Have the calibration test chute ready. The calibration test chute is in the cen-
tre behind the spreading disc guard.
A sufficient quantity of fertiliser is placed in the hopper.
The preliminary settings for the metering slide stop, the PTO speed and the
calibration test time are specified and known from the calibration charts.
n
WARNING
Risk of injury due to chemicals
Discharged fertiliser may cause injuries to eyes and nasal mucous
membrane.
Wear safety goggles during the calibration test.
Direct all persons out of the danger zone of the solid ferti-
liser broadcaster
NOTICE
Select the values for the calibration test for the maximum possible spreading
rate. The greater the application rate the greater the precision of the measure-
ment.
[1] Position of calibration test chute
Figure 19:
Calibration test chute
1
Содержание AXIS 20.1
Страница 4: ......
Страница 12: ...Contents VIII...
Страница 14: ...Intended use 1 2 AXIS GENERAL...
Страница 46: ...Transport without tractor 6 34 AXIS GENERAL...
Страница 48: ...Instructions regarding the spreading process 7 36 AXIS GENERAL...
Страница 156: ...Maintenance and repair C 144 AXIS GENERAL AXIS 20 1 AXIS 30 1 W AXIS 40 1 W...
Страница 194: ...Appendix D 182 AXIS GENERAL AXIS 20 1 AXIS 30 1 W AXIS 40 1 W AXIS 50 1 W...
Страница 214: ......
Страница 215: ......