background image

7

Issue 01 JAN.20

Step 21 - Fit Cover Caps

1. At the top of both wall 
posts secure and fit the Top 

Caps (M224-01) with the 

No.4x13mm CSK screws 
provided.

Step 24 - Wait 24hr

1. Allow 24 hours before using the shower.

Step 23 - Seal the Enclosure

1. On the 

outside, silicone around all three junctions with the wall and tray,

and also all the way round the bottom rail. On the 

inside, only silicone along the two vertical 

junctions with the wall. And along the shim only if used. Silicone seal where the fixed panels 
meed the rails, shown below.

2. Do not silicone seal on the inside of unit (except where shown). Sealing the

wall posts & sills to the tray on the inside can result in leakage problems -

please note that, in use, water can penetrate into the frame extrusions- this

has no detrimental effect to the product- however, this water must be allowed to drain out of 

the extrusions to the inside. Silicone down the wall posts wall junction.

When installed correctly, Kudos guarentee the enclosure will not leak under normal 

showering use, ie. when the shower head is in it’s normal showering position.
N.B. - Using the shower head to clean/rinse down the enclosure does not constitute normal 
showering use.

Step 20 - Fitting the Door Seals

1. There are two longer seals (2 x 1940mm) and one shorter (1 x 1926mm) similar to the diagram 
shown. The longer seals fit the the fixed glass panels either side of the door. From starting at the bottom, 

press these over the glass ensuring they are fully seated over the entire length between the top and 

bottom chrome castings.

2. Next fit the door closing seal at centre on the handle side.

Orientated if Hinge 

Side is this end.

1 x 1940mm

PlexRF-019 

Inside of 

enclosure

1 x 1940mm

PlexRF-019 

1 x 1926mm

PlexRF-019 

Inside of 

enclosure

Inside of 

enclosure

Step 22 - Adjust Closing Strength

1. The magnetic closing strength of the folding doors 
can be reduced if required. Using 2mm allen key 

supplied, loosen the grub screw in the top rail magnet 
and offset the magnet to one side, then re-tighten grub 

screw. Repeat for bottom rail magnet.
Maximum offset adjustment is 10mm.

Inside view

SILICONE ALONG SHIM ONLY

Outside Only

Inside Only

Содержание Pinnacle 8 CENTREFOLD 800

Страница 1: ...mix of white vinegar and water works well DO NOT use strong detergents abrasive cleaners or abrasive scrubbing equipment for cleaning these can damage the coating DO use a squeegee to remove remaining droplets of water from glass after showering any build up of residue can be removed easily using an appropriate cleaner and agitation from soft cleaning equipment Cleaning General Kudos LifeShield Gl...

Страница 2: ... DOOR PACK A 800 P8CF80P1 P8CF80P2 770 to 790 900 P8CF90P1 P8CF90P2 870 to 890 1000 P8CF100P1 P8CF100P2 970 to 990 PRODUCT PACK CODES DIMENSIONS mm CENTRE FOLD SIDE PANEL PACK B 800 P8CF2SP80 770 to 790 900 P8CF2SP90 870 to 890 ENCLOSURE HEIGHT 2000mm 26mm A 26mm A LEFT HAND INSTALLATION RIGHT HAND INSTALLATION ...

Страница 3: ...lpost is vertical 4 Position side panel wall post 16mm in from front edge of the tray as shown Repeat the above steps Insert screw heads into the wizard tool supplied to help locate screws into wall plugs Then tighten with pozi head screwdriver 1 Take note of label on glass This surface to outside this will determine which is the bottom edge of your installation 2a For 800 Side Panel Unit acquire ...

Страница 4: ...ls Step 4 Fit Corner Joint Seal 1 Acquire the PlexRF 018 06 from the Side Panel Pack From starting at the bottom press this over the glass edge ensuring that it is fully seated over the entire length Position as shown If tight lubricate corner seal and glass edges with a damp clean cloth to ease fitment the water will evaporate over a short period Do not use silicone spray or any other substance o...

Страница 5: ...ram below 2 Secure the rail with M144 02 AG using No 6x19 CSK Apply to the end you intend the door to pivot hinge from Secure the opposite side with SF BIF CLMP 998 using M6x30 CSK Step 11 Fit Top Rail to Fixed Panels 1 Acquire the remaining last rail Outer extrusion to be on the outside of the glass Like step 7 line up the 2 holes on the rail with 2 slot holes at the top of the glass Ensure flang...

Страница 6: ...ottom hinge and fully tighten Open the door and discard the spacer block 1 Acquire SF BIF SLID 998 from the installation pack and disassemble Insert the top slide on the closing side of the door into the rail by tilting the slide and lowering the rectangular slide into the track of the rail Tilt the slide and offer it into the rail as shown 2 Now push up and into the Slide will run smoothly in the...

Страница 7: ...nclosure will not leak under normal showering use ie when the shower head is in it s normal showering position N B Using the shower head to clean rinse down the enclosure does not constitute normal showering use Step 20 Fitting the Door Seals 1 There are two longer seals 2 x 1940mm and one shorter 1 x 1926mm similar to the diagram shown The longer seals fit the the fixed glass panels either side o...

Отзывы: