Recovery, loading and transport
31
Recovery
!
Attach the tow bar or tow rope to the attachment point (1) on
the excavator and to the towing vehicle.
!
If the attachment point of the excavator is not accessible, a tow rope can also be fastened around the centre
of the dozer.
!
During the recovery procedure, the operator must be seated on the operator’s place.
!
Drive slowly with the towing vehicle to avoid abrupt loads.
Hoisting the excavator with a crane
!
Bring the excavator to the lifting position (see figure) on level
ground.
!
Lift the dozer until the dozer cylinders are fully retracted. Also
see the "Operating the controls during excavation work" sec-
tion) (page 78).
!
Bring the boom in line with the longitudinal axis of the swivel frame.
!
Bucket cylinders and arm cylinders, respectively, must be extended up to the stop position.
!
Boom cylinders must be extended up to the stop position.
!
Swivel the swivel frame so that the dozer is located at the rear.
!
Close and lock the door and covers.
Adhere to the safety rules (page 13) and the safety
rules for recovery (page 29).
A recovery is only allowed over a short distance and at
walking speed (0.5 m/s ~ 1.0 m/s).
Adhere to the safety rules (page 13) and the safety
rules for hoisting the excavator with a crane (page 29).
The excavator may only be lifted at the points provided. Do not attach the lifting gear to any other
eyes or areas as this can lead to substantial damage.
1
STOP
Lifting position
STOP
STOP
Содержание KX 016-4
Страница 10: ...Tables 10...
Страница 13: ...General information 13...
Страница 155: ...Lifting capacity of the excavator 154 KX019 4 SF cab arm 1090 mm KX015 4 KX016 4 canopy arm 950 mm...
Страница 156: ...Lifting capacity of the excavator 155 KX018 4 KX019 4 canopy arm 1090 mm and arm 1190 mm KX019 4 SF canopy arm 1090 mm...
Страница 165: ......