3 WORK
24
3.8
Installing the fork legs
402556-10
Main work
(EXC
‑
F EU/AU/US/BR)
–
Position the fork legs.
Bleeder screws
1
are positioned toward the front.
Info
Grooves are milled into the side of the upper end of
the fork legs. The second milled groove (from the
top) must be flush with the top edge of the upper
triple clamp.
V00452-11
–
Tighten screws
2
.
Guideline
Screw, top triple
clamp
M8
20 Nm
(14.8 lbf ft)
–
Tighten screws
3
.
Guideline
Screw, bottom
triple clamp
M8
15 Nm
(11.1 lbf ft)
402556-10
(All Six Days models)
–
Position the fork legs.
Bleeder screws
1
are positioned toward the front.
Info
The rebound damping is located in right fork
leg
REB
(red adjusting screw). The compression
damping is located in left fork leg
COM
(white
adjusting screw).
Grooves are milled into the side of the upper end of
the fork legs. The second milled groove (from the
top) must be flush with the top edge of the upper
triple clamp.
E00378-11
–
Tighten screws
2
.
Guideline
Screw, top triple
clamp
M8
17 Nm
(12.5 lbf ft)
–
Tighten screws
3
.
Guideline
Screw, bottom
triple clamp
M8
15 Nm
(11.1 lbf ft)
Содержание F8203S2
Страница 1: ...SETUP INSTRUCTIONS 2019 350 EXC F 350 EXC F Six Days Art no 3213898en...
Страница 2: ......
Страница 21: ...SETUP 2 19 Info In order to be able to start the motorcycle the transport mode must be deactivated...
Страница 47: ...AUXILIARY SUBSTANCES 6 45 Long life grease Recommended supplier Motorex Bike Grease 2000...