
WORK 3
21
S01328-10
–
Detach plug-in connectors
2
and take off the headlight
mask with the headlight.
V00469-10
(EXC-F US)
–
Detach the brake line and wiring harness from the head-
light mask.
–
Release rubber bands
1
. Slide the headlight mask up
and swing it forward.
V00459-10
–
Detach plug-in connectors
2
and take off the headlight
mask with the headlight.
3.4
Installing the headlight mask with the headlight
S01328-11
Main work
(EXC
‑
F EU/AU/BR, All Six Days models)
–
Connect plug-in connectors
1
.
V00458-11
–
Position the headlight mask and fix it with rubber
bands
2
.
The holding lugs engage in the fender.
–
Position the brake line and wiring harness in the brake line
guide.
Содержание F8203S2
Страница 1: ...SETUP INSTRUCTIONS 2019 350 EXC F 350 EXC F Six Days Art no 3213898en...
Страница 2: ......
Страница 21: ...SETUP 2 19 Info In order to be able to start the motorcycle the transport mode must be deactivated...
Страница 47: ...AUXILIARY SUBSTANCES 6 45 Long life grease Recommended supplier Motorex Bike Grease 2000...