
STORAGE 21
113
21.2
Preparing for use after storage
401059-01
–
Take the motorcycle off the front lifting gear. (
–
Remove the rear of the motorcycle from the lifting gear.
(
–
Charge the 12-V battery.
–
Install the 12-V battery.
–
Set the time and date.
–
Perform checks and maintenance measures when preparing for
use. (
–
Take a test ride.