
MAINTENANCE WORK ON CHASSIS AND ENGINE
56
–
Mount lower shells
.
–
Position the handlebar.
Info
Make sure cables and wiring are positioned correctly.
–
Position handlebar clamps
with rubber washers
and elastomeres
.
Elastomer kit green - soft quality (SXS05125203)
Elastomer kit yellow - medium quality (standard) (SXS05125204)
Elastomer kit red - hard quality (SXS05125205)
Info
The elastomeres are available in different versions.
–
Mount and evenly tighten the four screws
.
Guideline
Screw, handlebar clamp
M8
16 Nm
(11.8 lbf ft)
Info
Make sure the gap width is even.
13.45
Checking gas Bowden cable route
600672-10
–
The two gas Bowden cables must run parallel behind the handlebar down to the
frame. They must be routed directly on the frame above the tank bearing to the car-
buretor.
13.46
Checking play in the gas Bowden cable
400192-10
–
Move the handlebar to the straight-ahead position. Move the throttle grip back and
forth slightly to ascertain the play in the gas Bowden cable.
Play in gas Bowden cable
3… 5 mm (0.12… 0.2 in)
» If the gas Bowden cable play does not meet specifications:
–
Adjust the gas Bowden cable play.
x
Содержание 2009 250 EXC-F SIX DAYS
Страница 2: ......
Страница 110: ...WIRING DIAGRAM 108 ye re Yellow red ...
Страница 111: ...WIRING DIAGRAM 109 ...
Страница 125: ... 3211348en 3211348en KTM Sportmotorcycle AG 5230 Mattighofen Austria http www ktm com 06 2008 Photo Mitterbauer ...