5 Installation at Site
26 of 98
UPA / UPA S
3400.86/17-EN
WARNING
Laying electric cables at temperatures below zero degrees
Damage to the electric cable!
▷
Observe the minimum permissible temperature at the cable surface of -25 °C for
moving cables.
▷
Observe the minimum permissible temperature at the cable surface of -40 °C for
stationary cables.
NOTE
Do not expose the electric cable to direct sunlight.
NOTE
A separate name plate is included in the scope of supply.
This name plate must be attached in a clearly visible position outside the place of
installation, e.g. at the control panel, pipeline or mounting bracket.
NOTE
The motor lead is selected for submerged operation and must be completely
submerged, including the cable connector.
See order documentation for any other use!
For pump sets installed in VdS-approved sprinkler installations always refer to and
observe the applicable requirements stipulated by VdS (German association of
property insurance companies). In accordance with VdS 2025, the cable must be laid
in such a way that it is protected against short circuit and earth fault.
5.2 Preparing the installation
5.2.1 Checking the installation conditions
Prior to starting with the installation, check compliance with the particular
framework conditions required for a trouble-free operation of the submersible
borehole pump. To do so, verify the order data or delivery data against the
constructional plans, the operating conditions and the operating limits of the pump
set.
1.
Has this pump set been ordered for this particular installation position?
(
2.
Does the material variant of the pump set match the operating conditions?
3.
Is appropriate flow along the motor provided? (
4.
Can the required minimum submergence be ensured during operation?
(
5.
Is the sand content of the fluid to be handled below the specified maximum?
(
6.
Is the temperature of the fluid to be handled below the specified maximum?
(
7.
If fluids liable to form deposits are handled, is temperature monitoring provided?
(
8.
Will the motor lead and the cable connector be completely immersed in the fluid
to be handled? (