RC, RCV 

 

 

 

Installation 

The  design  of  the  pipe  systems,  anchorings 
and  other  installation  areas  corresponds  to 

other parties.  KSB ITUR only offers details and comments as 
a help, but does not assume any responsibility with regards to 
the  design,  assembly  and  operation  of  any  installation.  We 
recommend  that  customers  should  check  with  a  specialist  in 
the  design  of  castings,  pipes,  wells,  etc,  to  supplement  and 
interpret the information provided by KSB ITUR and to ensure 
proper  operation.  If  wearing  plastic  bushings  between  pin 
clamp  screw  and  motor  foot,  the  removal  of  these  plastic 
bushings  is  required  before  alignment  of  the  group  and 
subsequent start-up. 

5.1 

Check before assembly 

Before positioning, check that the assembly base is in line with 
the dimensional plan of the equipment. 

The  base  slab  upon  which  the  equipment  is  to  be  positioned 
must have completely set. 

The  concrete  used  must  be  of  sufficient  resistance  (minimum 
X0) to allow functional assembly in line with DIN-1045.  

The upper surface of the base must be horizontal and flat. 

If the anchor pins are to be placed in existing holes, place the 
anchor pins in their orifices suspended from the pump. 

Do  not  connect  the  suction  and  impulsion  nozzles  until  the 
equipment is completely installed on its base and the cement 
has completely set. 

5.2 

Group positioning 

5.2.1 

Groups with horizontal base frame 

Levelling 

 

Place  wedges  on  both  sides  of  the  anchor  pins  if  the  base 
frame does not include levelling screws. 

When the distance between anchor pins is over 800 mm, use 
levelling  wedges  in  the  middle,  both  on  the  sides  and  at  the 
front. 

Use a spirit level to level the equipment. Use wedges to alter 
the  height  at  different  points.  The  maximum  deviation 
permitted is 0.2 mm/m. 

The  separation  between  the  two  coupling  halves  must  be 
maintained. 

All  equipment  supplied  on  a  transport  bench  (forklift 
truck,  carriage,  etc)  should  be  secured  using  the 
envisaged  attachment  device  or  brake.  Ask  KSB 

ITUR  for  the  specific  instructions  manual  for  your  transport 
bench if you do not have one already (see annex 

 0

)

Cementing 

Pour  an  initial  layer  of  mortar  cement  into  the  orifices  of  the 
bolts, contacting throughout the periphery with the base of the 
base  frame.    Once  the  mortar  cement  has  set,  tighten  the 
anchor pins in a balanced manner. 

Connect  the  suction  and  impulsion  nozzles  to  the  installation 
and proceed with an initial alignment of the equipment. 

Proceed to fill the lower part, or the cavities between the base 
frame profiles, with concrete. 

When using folded steel base frames, make a small mould in 
the front and rear part. 

 

The  concrete  must  be  of  minimum  contraction,  normal 
granulometry, with a water/cement ratio (W/C Ratio) of ≤0.5. It 
is necessary to use additives which improve fluidity for correct 
filling. 

We recommend treating the concrete in line with DIN-1045. 

In  order  to  carry  out  the  final  alignment,  wait  until  the 
installation is ready and at operation temperature. 

 

Pump-motor alignment 

In  order  to  prevent  misalignment  between  the  shafts,  it  is 
necessary to correctly install, check and maintain the coupling. 
See the instructions manual for the coupling. 

The coupling may produce a source of ignition or high 
temperature  in  the  event  of  incorrect  operation.  The 

coupling  must  be  classified  as  non-electric  equipment  with  at 
least the same type of area and temperature as the pump. It is 
necessary  to  follow  the  instructions  in  the  coupling  manual 
which  is  included  with  the  pump  (only  if  special  coupling  is 
mounted) 

When the supply includes the complete group (pump 

– motor), 

the  equipment  has  been  aligned  at  factory,  although,  due  to 
transport  and  to  the  anchoring  to  the  casting,  the  equipment 
should be realigned before proceeding with start-up. 

The  correct  alignment  of  the  group  (pump-motor)  involves 
correcting  any  possible  errors  of  parallelism  and  concentricity 
of the coupling,  using metal wedges in the motor foot. (Could 
be necessary to remove the engine alignment plug) 

Use  appropriate  instruments  to  carry  out  the  following 
measurements  in  4  positions  offset  90º  between  the  faces  of 
the coupling:  

 

Note 

Содержание RC Series

Страница 1: ...s important instructions and warnings You must read them before mounting making the electrical connections and starting up You must also comply with the instructions for the components related to this pump Please remember that this Manual must be kept close to the motor pump group ...

Страница 2: ...otor connection 9 5 4 2 Timer relay adjustment 9 5 4 3 Check rotation direction 10 6 START UP 10 6 1 FIRST START UP 10 6 1 1 Lubricant 10 6 1 2 Filling priming of the pump 10 6 1 3 Final control 10 6 1 4 Start up 10 6 1 5 Shutdown 11 6 2 SERVICE LIMITS 11 6 2 1 Start up frequency 11 6 2 2 Temperature of the liquid to be pumped 11 6 2 3 Viscosity of the liquid to be pumped 11 6 2 4 Maximum pump spe...

Страница 3: ... to satisfy Directive 94 9 EC on the prevention of the risk of explosion The details shown directly on the machine such as Rotation direction arrow Fluid connections identifications These must be complied with and conserved in a manner which ensures they are legible 2 2 Personnel qualifications and instruction All Service Maintenance Inspection and Assembly personnel must be duly qualified The ter...

Страница 4: ...er 40ºC In the event of a liquid with high steam pressure being used beware of the danger of explosion due to pressure confinement with the pump stopped This confinement must be avoided by opening inlet or discharge valves or by providing a properly conducted air vent connection in the pump discharge for liquid evacuation For rotating parts The pump should never work without its coupling guard in ...

Страница 5: ...ducts from contact with the low alloy liquid e g grey casting nodular casting etc Preservation products available on the sector market can be used in line with the manufacturer s instructions on application and disposal The pump or motor pump shall be deposited in a dry site where the relative humidity is as constant as possible When stored outside it is necessary to keep the pump motor pump in an...

Страница 6: ...ENTS N m FORCES N MOMENTS N m PUMP SIZE Fx Fy Fz Mx My Mz Fx Fy Fz Mx My Mz 00 NOT APPLICABLE THREADED NOZZLES 01 1 1 1 2 2 2R 242 242 242 121 121 121 242 242 242 121 121 121 2RD 242 242 242 121 121 121 242 242 242 121 121 121 3R 346 346 346 182 182 182 346 346 346 182 182 182 4R 415 415 415 222 222 222 415 415 415 222 222 222 ...

Страница 7: ...r brake Ask KSB ITUR for the specific instructions manual for your transport bench if you do not have one already see annex 0 Cementing Pour an initial layer of mortar cement into the orifices of the bolts contacting throughout the periphery with the base of the base frame Once the mortar cement has set tighten the anchor pins in a balanced manner Connect the suction and impulsion nozzles to the i...

Страница 8: ...ith the pump The equipment is aligned at factory and this alignment must never be lost The following instructions must be followed when dismounting or returning the motor Check that the flange support surface of the motor support and of the motor itself are perfectly clean and smooth Check the correct separation between the two halves of the coupling Check that the alignment between both shafts is...

Страница 9: ...out the connections We strongly recommend the use of a safety circuit breaker for the motor and a thermistor associated to a trigger device These instructions apply to asynchronous three phase standard electric motors with a squirrel cage both in horizontal and vertical execution in IP 23 IP 54 and IP 55 protection grades with frame sizes of between 56L and 355S both inclusive with voltages of 200...

Страница 10: ...he pumped fluid Lubricant is not required FRICTION BEARING BUSHES Lubricated with pumping fluid The pump friction bearing bushes are lubricated with the pumped fluid Lubricant is not required 6 1 2 Filling priming of the pump The pump must be primed before starting up for the first time or following a long period of inactivity To do this EQUIPMENT IN LOAD 1 Disconnect the voltage from the motor or...

Страница 11: ...ned at the shaft seal whilst the pump remains shutdown The pump must be protected from freezing whenever this risk exists and must be emptied in prolonged periods of non operation If whilst the pump is shutdown it must remain on standby for service start up at regular intervals for around 5 minutes see also 7 2 1 Fire pumps 1x month at minimum Drink safe water pumps 1x 48 hours at minimum Reserve ...

Страница 12: ...carried out in such a way as there is no risk to people or to the environment in line with legislation If necessary use protective clothing and mask 7 4 Dismounting 7 4 1 Fundamental instructions observations Before dismounting ensure the pump cannot be started up The suction and impulsion valves must be closed The pump frame must have returned to environmental temperature The pump frame must be d...

Страница 13: ...t the length of the covers so the shaft and coupling are fully covered 6 Secure the lifting plate 5 to its support 6 using the corresponding screws 7 If there is no lifting plate the locking screws 4 are longer and also fulfil this function 4 5 6 7 7 Finish tightening the locking screws 4 7 5 2 Coupling Flexible coupling 1 Mount the pump when it has been dismounted and tighten the attachment nuts ...

Страница 14: ...ements such as coupling guards before starting up the equipment The pump materials have been selected in accordance with the process fluid indicated in the datasheets If this fluid is modified check with KSB ITUR that the new fluid is suitable for the pump 7 5 6 Tightening torque of the screws nuts Steel Stainless steel ISO Metric thread Tightening Torque in N m for non lubricated thread M4 3 1 2 ...

Страница 15: ...gs With thermocouple Quarterly 9 13 6 Check tightness of connecting bolts for motor base frame pump base frame cover casing support support supplement flanges casing Manually Twice a year 7 7 Check and align the coupling See point 5 2 of the manual Twice a year and every time it is dismounted 8 COMPLETE PUMP CHECK Check and dismount the pump See point 7 of the manual Yearly 1 2 3 4 5 6 9 10 14 9 C...

Страница 16: ...pressure or density greater than shown Change the motor for a superior one if necessary X X X X Poor alignment between the pump and motor Align the coupling X Obstruction inside the pump or installation Dismount the pump and clean X X X Ball bearings deteriorated poorly assembled or poorly lubricated Check them check the assembly or lubricate them or adjust them properly in their positions X Exces...

Страница 17: ...ing 161 Casing cover 210 1 Driven shaft 210 99 Drive shaft 400 Gasket 412 O Ring 421 Lip seal 740 99 Valve kit 753 Valve cone Ref Description 757 Valve throttle 870 1 Gear unit 870 2 Gear unit 904 Grub screw 914 1 Allen screw 914 2 Allen screw 914 3 Allen screw 924 Adjusting nut 932 Circlip 940 Parallel key 950 Spring ...

Страница 18: ...cover 545 1 Bearing Bush 545 2 Bearing bush 545 3 Bearing bush 550 1 Washer 550 2 Washer 740 99 Valve kit Ref Description 750 Valve protector 753 Valve cone 757 Valve throttle 840 Coupling 860 Coupl Flexible element 870 1 Gear unit 870 2 Gear unit 901 1 Hexagonal Head Bolt 901 2 Hexagonal Head Bolt 914 Allen screw 916 Plug 924 Adjusting nut 932 Circlip 940 1 Parallel key 940 2 Parallel key 950 Spr...

Страница 19: ...chanical seal 471 Seal cover 545 1 Bearing Bush 545 2 Bearing bush 550 1 Washer 550 2 Washer 740 99 Valve kit Ref Description 750 Valve protector 752 Valve seat 753 Valve cone 757 Valve throttle 840 Coupling 860 Coupl Flexible element 870 1 Gear unit 870 2 Gear unit 901 Hexagonal Head Bolt 914 Allen screw 916 Plug 932 Circlip 940 1 Parallel key 940 2 Parallel key 950 Spring ...

Страница 20: ...ring 411 2 Joing ring 411 3 Joint ring 411 4 Joing ring 433 Mechanical seal 484 Spring plate 504 Spacer Ring 740 99 Valve kit 750 Valve protector 753 Valve cone Ref Description 757 Valve throttle 840 Coupling 860 Coupl Flexible element 870 1 Gear unit 870 2 Gear unit 900 Eyebolt 902 1 Stud 902 2 Stud 902 3 Stud 916 1 Plug 916 1 Plug 920 1 Nut 920 2 Nut 920 3 Nut 924 Adjusting Nut 940 1 Parallel ke...

Страница 21: ...Plug 920 1 Nut 920 2 Nut 924 Adjusting Nut 940 1 Parallel key 940 2 Parallel key 950 Spring Ref Description 102 99 Volute casing 161 1 Casing cover 161 2 Casing cover 210 98 Driven shaft 210 99 Drive shaft 321 Rigid Ball Bearing 360 Beaing cover 400 1 Gasket 400 2 Gasket 411 1 Joint ring 411 2 Joing ring 411 3 Joint ring 411 4 Joing ring 433 Mechanical seal 504 Spacer Ring 740 99 Valve kit 750 Val...

Страница 22: ...n sloping and clean in order to prevent any displacement If operation is by way of an electric motor with a pluggable connection check that the circuit breaker or operation selector is in shutdown position before connecting to the grid The start up instructions in the pump and motor manuals must be followed 9 1 3 Maintenance Apart from the particular instructions on maintenance of the pump and mot...

Страница 23: ...Decontamination certificate RC RCV This page has been left blank on purpose ...

Страница 24: ...Decontamination certificate RC RCV This page has been left blank on purpose ...

Страница 25: ...o dispatch placing at your disposal On sealless pumps the rotor has been removed from the pump for clearing No special safety precautions are required for further handling The following safety precautions are required for flushing fluids fluid residues and disposal We confirm that the above data and information are correct and complete and that dispatch is affected in accordance with the relevant ...

Страница 26: ...able to legally prove that these defects existed prior to installation and assembly KSB ITUR shall in no case be liable for any direct or indirect damage which the Product may suffer as a result of defective installation incorrect storage lack of maintenance negligent handling handling by unauthorised personnel overloading or deficient functions or for any damages resulting from external influence...

Отзывы: