
7 Operation
34 of 48
Hya-Duo D FL Compact
7.3 Functions
7.3.1 Automatic switchover (duty system and back-up system)
If the duty system fails (motor protection switch or phase monitoring tripped, 24 V
supply interrupted or control transformer failed), operation automatically switches
from the duty system to the back-up system.
Table 14:
Response in the event of a failure
Duty system fault
Back-up system fault
Response of pressure booster system
Motor protection switch tripped Motor protection switch tripped Back-up system ready for operation
24 V supply interrupted
Back-up system starts up
Control voltage interrupted
Switchover back to duty system
Duty system ready for operation
Failure phase monitoring
Switchover back to duty system
Duty system ready for operation
24 V supply interrupted
Motor protection switch tripped Back-up system ready for operation
24 V supply interrupted
Back-up system starts up
Control voltage interrupted
Switchover back to duty system
Duty system starts up
Failure phase monitoring
Switchover back to duty system
Duty system starts up
Control voltage interrupted
Motor protection switch tripped Back-up system ready for operation
24 V supply interrupted
Back-up system starts up
Control voltage interrupted
Switchover back to duty system
Pressure booster system no longer ready for
operation
Failure phase monitoring
Switchover back to duty system
Pressure booster system no longer ready for
operation
Failure phase monitoring
Motor protection switch tripped Back-up system ready for operation
24 V supply interrupted
Back-up system starts up
Control voltage interrupted
Switchover back to duty system
Pressure booster system no longer ready for
operation
Failure phase monitoring
Switchover back to duty system
Pressure booster system no longer ready for
operation